Development of a novel lot sizing model with variable lead time in supply chain environment
نویسندگان
چکیده مقاله:
Supply chain management (SCM) addresses the management of materials and information across the entire chain from suppliers to producers, distributors, retailers, and customer. The theory of supply chain management suggests that lead time reduction is a pioneer to the use of market mediation to reduce transaction uncertainty in the chain, which can be conceptualized as the primary goal of supply chain management. In the past few decades, scholars gave ample attention about the impact of inventory on SCM. This paper relates to the development of a lot sizing model for a single component multiple delivery system with variable demand and lead time of a multinational transformer company. Two models and the modification were developed on the basis of the following assumptions. For first model distribution of demand is normal, distribution of procurement lead time is exponential and the quantity is coming in a single lot. For second model distribution of demand is normal distribution of ‘procurement’ and ‘administrative delay’ lead time is exponential and the quantity is coming in a single lot. Modification of the first model has been done by taking the effect of multiple deliveries in the models and correcting the Re-order point as obtained from the previous models. The results were observed by the second model and analysis has been done for different parametric conditions. The effect of multiple deliveries is also taken into account. The optimum re-order point and economic ordering quantity with various different inputs have been discussed.
منابع مشابه
Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain
The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...
متن کاملA queuing-location model for in multi-product supply chain with lead time under uncertainty
Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...
متن کاملA seller-buyer supply chain model with exponential distribution lead time
Supply chain is an accepted way of remaining in the competition in today's rapidly changing market. This paper presents a coordinated seller-buyer supply chain model in two stages, which is called Joint Economic Lot Sizing (JELS) in literature. The delivery activities in the supply chain consist of a single raw material. We assume that the delivery lead time is stochastic and follows an exponen...
متن کاملIntegrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System
The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...
متن کاملpredicting intention to adopt interorganizational linkages: a study in iranian automative indusrty supply chain in b2b environment
در این پایان نامه مسایل مربوط به ارتباطاط سازمانی و نحوه تاثیر گذاری فناوری اطلاعات بر روی آنها بررسی میشود. انواع مدلهای سازمانی و بررسی متغیرهای مختلف بصورت آماری از اهداف این پایان نامه می باشد. ارتباطاط edi در محیط های b2b هدف اصلی مدل های بررسی شده می باشد.
15 صفحه اولJOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 10 شماره 22
صفحات 25- 38
تاریخ انتشار 2017-04-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023