Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making
نویسندگان
چکیده مقاله:
Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of the network. This approach transforms the network into a simpler equivalent one. This paper discusses the constrained consumable resource allocation problem in an ASN. Many recent researchers apply heuristic and simulation methods to solve the constrained resource allocation in these problems. In this paper, we propose an analytical approach based on multi-objective modeling. The objective functions of this model are the cumulative distribution function of the completion time of ASN paths. These functions must be maximized within the desired network completion time. Lexicographic method is used to solve the proposed multi-objective model. The proposed method is illustrated by an example.
منابع مشابه
Constrained Consumable Resource Allocation in Uncertain Project Networks with Fuzzy Activity Duration
متن کامل
A heuristic method for consumable resource allocation in multi-class dynamic PERT networks
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...
متن کاملconstrained consumable resource allocation in uncertain project networks with fuzzy activity duration
متن کامل
Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 8 شماره 1
صفحات -
تاریخ انتشار 2012-01-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023