Introduction: Since commissioning beam data are treated as a reference and ultimately used by treatment planning systems, it is vitally important that the collected data are of the highest quality to avoid dosimetric and patient treatment errors that may subsequently lead to a poor radiation outcome. Beam data commissioning should be performed with appropriate knowledge and proper tools and should be independent of the person collecting the data. low-energy linear accelerator was introduced in the clinical area by ELEKTA Medical Systems. This machine was first installed in Sistan and Baluchestan state in 2016. The aim of the present contribution was to report experience about its commissioning and first year results from clinical operation. Materials and Methods: In this research, we used water phantom model DoseviewTM 3D version1.2 and A19 and A28 ion chambers. Commissioning data, beam characteristics and the modeling into the treatment planning system were summarized. . Finally, since the system is capable of delivering Threaetment dose with 6 Mev of energy , a summary of the tests performed for such modality to assess itsperformance in preclinicalsettings and during clinical usage was included. Results: The absorbed dose according to the TRS398 protocol in the absolute dosimetry was D = 0.010042Gy / Mu. In a relative dosimetry, PDD was calculated at different depths and fields, results at 10 cm depth for field 10 × 10 was equal to 0.661 and for the field 30 × 30 at the same depth of 10 cm was equal to 0.690. Also Measurements were made to determine the flatness and symmetry in different fields at a depth of 10cm. For example, the flatness in field 10×10 at depth of 10cm was 3.7 and its Asymmetry value was -0.7%. Conclusion: The results of the commissioning tests and of the first period of clinical operation, resulted meeting specifications and having good margins respect to tolerances. Linac was put into operation for all deliverytechniques; in particular, as shown by the pre-treatment quality assurance results, it enabledaccurate and safedelivery of 3D planning.
منابع مشابه
Commissioning and early experience with a new-generation low-energy linear accelerator with advanced delivery and imaging functionalities
BACKGROUND A new-generation low-energy linear accelerator (UNIQUE) was introduced in the clinical arena during 2009 by Varian Medical Systems. The world's first UNIQUE was installed at Oncology Institute of Southern Switzerland and put into clinical operation in June 2010. The aim of the present contribution was to report experience about its commissioning and first year results from clinical o...
متن کاملCommissioning an Elekta Versa HD linear accelerator
The purpose of this study is to report the dosimetric aspects of commissioning performed on an Elekta Versa HD linear accelerator (linac) with high-dose-rate flattening filter-free (FFF) photon modes and electron modes. Acceptance and commissioning was performed on the Elekta Versa HD linac with five photon energies (6 MV, 10 MV, 18 MV, 6 MV FFF, 10 MV FFF), four electron energies (6 MeV, 9MeV,...
متن کاملCommissioning and acceptance testing of a CyberKnife linear accelerator
Acceptance testing and commissioning of a CyberKnife robotic stereotactic radiosurgery system was performed in April 2006. The CyberKnife linear accelerator produces a photon beam of 6 MV nominal energy, without the use of a flattening filter. Clinically measured tissue-phantom ratios, off-center ratios, and output factors are presented and compared with similar data from other CyberKnife sites...
متن کاملa new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot
abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...
15 صفحه اولCommissioning Experience with Caribu
The Californium Rare Ion Breeder Upgrade (CARIBU) of the ATLAS superconducting linac facility aims at providing low-energy and reaccelerated neutron-rich radioactive beams to address key nuclear physics and astrophysics questions. These beams are obtained from fission fragments of a Cf-252 source, thermalized and collected into a low-energy particle beam by a helium gas catcher, mass analyzed b...
متن کاملCommissioning Experience with the PEP-II Low-Level RF System*
The low-level RF system for PEP-II is a modular design housed in a VXI environment and supported by EPICS. All signal processing and control is done at baseband using in-phase and quadrature (IQ) techniques. Remotely configurable RF feedback loops are used to control coupled-bunch instabilities driven by the accelerating mode of the RF cavities. A programmable DSP based feedback loop is impleme...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 15 شماره Special Issue-12th. Iranian Congress of Medical Physics
صفحات 291- 291
تاریخ انتشار 2018-12-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023