Application of Multi Objective HFAPSO algorithm for Simultaneous Placement of DG, Capacitor and Protective Device in Radial Distribution Network

نویسندگان

  • Hossein Shayeghi Electrical Engineering Department, University of Mohaghegh Ardabili, Ardabil, Iran
  • Masoud Alilou Electrical Engineering Department, University of Mohaghegh Ardabili, Ardabil, Iran
چکیده مقاله:

In this paper, simultaneous placement of distributed generation, capacitor bank and protective devices are utilized to improve the efficiency of the distribution network. The objectives of the problem are reduction of active and reactive power losses, improvement of voltage profile and reliability indices and increasing distribution companies’ profit. The combination of firefly algorithm, particle swarm optimization and analytical hierarchy process is proposed to solve the multi-objective allocation problem. The proposed method is implemented on IEEE 69-bus and also an actual 22-bus distribution systems in Tehran-Iran. Test results approve the effectiveness of the proposed method for improved reliability and network performance of the distribution network.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

application of multi objective hfapso algorithm for simultaneous placement of dg, capacitor and protective device in radial distribution network

in this paper, simultaneous placement of distributed generation, capacitor bank and protective devices are utilized to improve the efficiency of the distribution network. the objectives of the problem are reduction of active and reactive power losses, improvement of voltage profile and reliability indices and increasing distribution companies’ profit. the combination of firefly algorithm, parti...

متن کامل

Application of Multi Objective HFAPSO Algorithm for Simultaneous Placement of DG, Capacitor and Protective Device in Radial Distribution Network

In this paper, simultaneous placement of distributed generation, capacitor bank and protective devices are utilized to improve the efficiency of the distribution network. The objectives of the problem are reduction of active and reactive power losses, improvement of voltage profile and reliability indices and increasing distribution companies’ profit. The combination of firefly algorithm, parti...

متن کامل

Application of Fuzzy and ABC Algorithm for DG Placement for Minimum Loss in Radial Distribution System

Distributed Generation (DG) is a promising solution to many power system problems such as voltage regulation, power loss, etc. This paper presents a new methodology using Fuzzy and Artificial Bee Colony algorithm(ABC) for the placement of Distributed Generators(DG) in the radial distribution systems to reduce the real power losses and to improve the voltage profile. A two-stage methodology is u...

متن کامل

Simultaneous Placement of Capacitor and DG in Distribution Networks Using Particle Swarm Optimization Algorithm

Nowadays, using distributed generation (DG) resources, such as wind and solar, also improving the voltage profile in distribution companies has been considered. As optimal placement and sizing of shunt capacitors become more prevalent, utilities want to determine the impact of the various capacitors placement in distribution systems. Locating and determining the optimal capacity of shunt capaci...

متن کامل

Simultaneous placement of DG and capacitor in distribution network

In this study, the planning problem concerned with simultaneous placement of distribution generation (DG) and capacitor bank in the distribution network is investigated from a local distribution company’s (DISCO’s) viewpoint based on minimum total cost over the planning period and applying genetic algorithm (GA). The cost terms of the objective function include risk cost of load not supplied of...

متن کامل

Multi-objective Based Optimization Using Tap Setting Transformer, DG and Capacitor Placement in Distribution Networks

In this article, a multi-objective function for placement of Distributed Generation (DG) and capacitors with thetap setting of Under Load Tap Changer (ULTC) Transformer is introduced. Most of the recent articles have paidless attention to DG, capacitor placement and ULTC effects in the distribution network simultaneously. Insimulations, a comparison between different modes was carried out with,...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 3  شماره 2

صفحات  131- 146

تاریخ انتشار 2015-12-15

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023