Analyzing effective factors on rural participation in watershed management activities (Case study: Cheshmeh Zainal Broujen)
نویسندگان
چکیده مقاله:
Broujen township is located at an area of 2755 square kilometers(16 percent of the area of Chaharmahal and Bakhtiari province) 65 kilometers from the province center(Shahrekord). In 2016, this township had 122483 inhabitants in the form of 36,238 households. In recent years, various watershed management activities have been implemented at the provincial level or planned for implementation in order to control and maintain surface water and optimize their use. This research was conducted with the aim of analyzing the factors affecting the participation of rurals in watershed management in Cheshmeh Zainal watershed of Broujen township in Chaharmahal and Bakhtiari province. The data collection tool was a questionnaire and the collected data were analyzed using descriptive statistics and inferential statistics and analyzed by SPSS software. The results show that there is a negative and non-significant relationship between age (r = -0.136) and the experience of people in agriculture(r = -0.032) with their participation in watershed activities. Also, there was a positive and significant relationship between social versatility(r = 0.43), socioeconomic status(r = 0.57), membership in rural public institutions(r = 0.36) and use of information resources(r = 0.37) with respondents' participation in watershed activities at one percent. The results of multi regression analysis in stepwise method indicate that the level of awareness of the goals and characteristics of watershed projects has the highest role(0.53) in the participation rate of the respondents in the watershed management activities.
منابع مشابه
Effective Factors on Rural People’s Non-Participation of Mahabad’s Dam Catchment in Watershed Management Projects
The purpose of this descriptive-correlation study was to investigate effective factors on rural people’s non-participation of Mahabad’s dam catchment in Watershed Management Projects. The research instrument was structural questionnaire with close-ended questions, which its validity confirmed by panel of academic staff and reliability of questionnaire was confirmed. The target population of thi...
متن کاملIdentification and Prioritization of Effective Factors on Preventing Participation of Rural Societies in watershed Management Plans Case Study (Niarij Watershed of Qazvin Province)
Peoples’ participation in watershed development projects, in addition to reducing operating costs, can lead to more effective project implementation. Various factors causes the lack of public participation in watershed development projects. The purpose of this study was to identify, classify and prioritize these factors based on local people as well as experts viewpoints in Niarij watershed of ...
متن کاملeffective factors on rural people participation in watershed management projects (case study: dorod faraman & lalabad basin, kermanshah province)
the purpose of this descriptive-correlation study was to investigate effective factors on rural people participation in watershed management projects in dorod faraman & lalabad basin, kermanshah province. both qualitative and quantitative paradigms were considered in the study. the target population in quantitative section consisted all rural peoples in the dorod faraman & lalabad basin village...
متن کاملeffective factors on rural people’s non-participation of mahabad’s dam catchment in watershed management projects
the purpose of this descriptive-correlation study was to investigate effective factors on rural people’s non-participation of mahabad’s dam catchment in watershed management projects. the research instrument was structural questionnaire with close-ended questions, which its validity confirmed by panel of academic staff and reliability of questionnaire was confirmed. the target population of thi...
متن کاملInvestigating and prioritizing factors affecting the non-participation of rural societies in watershed management projects (Case study: Asadli watershed, North Khorasan Provience)
Effective and less expensive implementation of plans, protection of projects, and future restoration of structures require the participation of stakeholders in all stages of study, implementation, monitoring, evaluation, and maintenance. Therefore, identifying and classifying indicators and sub-indices that affect people's participation and promoting them in the implementation of watershed and ...
متن کاملImpact of Watershed Management activities on flood hydrograph Using HEC-HMS Model (Case Study: Ramyan Watershed)
Increasing the use of water and soil resources in watershed in recent years and unproductive and inappropriate use of land ecology has exacerbated the occurrence of floods. In this context, watershed management is one of the most effective ways to cope with this crisis. This research quantify the results of these activities by calculating the decreased volume and discharge due to biomechanical ...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 13 شماره 46
صفحات 102- 111
تاریخ انتشار 2019-10
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
کلمات کلیدی برای این مقاله ارائه نشده است
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023