Analysis on Components Complexity During Execution of Construction Projects

نویسندگان

چکیده مقاله:

Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the managerial variables which will prompt limitations which let-down the development concerning cost, time and quality parts of development from five segments which are critical in execution of development venture. A sum of 51 managerial variables is considered from five components specifically material, labor, equipment, quality control and safety. Data validation is completed for 51 calculated managerial factors. Results revealed that Cronbach coefficient value for all components in three constraints are with range of 0.8-0.9 which is considered as highly reliable with assumed scale. Relative significance is done on these factors. The obtained results reveal that value acceleration of material is 1st most variable with 0.85 RII esteem, which would be a basic element prompting limitation and may let-down the development. Truancy of work with 0.866 RII esteem as far as time limitation, low material quality observing framework with 0.903 regarding quality requirement and afterward relationship examination is finished with variables harmonizing the three imperatives. The result revealed that work efficiency is critical among all components which is associated with 19 different elements above moderate scale. Any need and impact on these elements will demonstrate way on different perspectives which may prompt requirement that let-down the development venture.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Factors of Complexity in Construction Projects

Construction projects are often described as being complex; however, the relationship between project complexity and other key project components such as risk and uncertainty is not widely established. As part of a global research project aimed at establishing the impact of project complexity at the pre construction stage, research has been carried out to investigate this relationship. Intervie...

متن کامل

the effect of task complexity on lexical complexity and grammatical accuracy of efl learners’ argumentative writing

بر اساس فرضیه شناخت رابینسون (2001 و 2003 و 2005) و مدل ظرفیت توجه محدود اسکهان (1998)، این تحقیق تاثیر پیچیدگی تکلیف را بر پیچیدگی واژگان و صحت گرامری نوشتار مباحثه ای 60 نفر از دانشجویان زبان انگلیسی بررسی کرد. میزان پیچیدگی تکلیف از طریق فاکتورهای پراکندگی-منابع تعیین شد. همه ی شرکت کنندگان به صورت نیمه تصادفی به یکی از سه گروه: (1) گروه موضوع، (2) گروه موضوع + اندیشه و (3) گروه موضوع + اندی...

15 صفحه اول

Fuzzy Complexity Analysis with Conflict Resolution for Educational Projects

Evaluative and comparative analysis among educational projects remains an issue for administration, program directors, instructors, and educational institutes. This study reports a fuzzy complexity model for educational projects, which has two primary aspects (technical aspects and transparency aspects). These aspects may not be measured precisely due to uncertain situations. Therefore, a fuzzy...

متن کامل

Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects

Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...

متن کامل

Management of Information Flows during Construction Projects

The right management of information is crucial in construction projects and has been studied by many researchers. This paper begins by defining and discussing some information management concepts. In particular, it proposes a reflection about the pull-push model for transferring information and links the resulting ideas to some generic issues of information management, namely information overlo...

متن کامل

Study on Construction Cost of Construction Projects

China is a country which has the largest investment amount in engineering construction in the world and which has the most construction projects. It is a significant subject for the extensive engineering managers to have effective engineering cost management in construction project management and to reasonably determine and control construction cost on the condition of ensuring construction qua...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 29  شماره 9

صفحات  1227- 1234

تاریخ انتشار 2016-09-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023