Analysis of reliability and maintainability for multiple repairable units (Case study: Sungun copper mine)
نویسندگان
چکیده مقاله:
The appropriate operating of mining machines is affected by both the executive and environmental factors. Considering the effects and the related risks lead to a better understanding of the failures of such machines. This leads to a proper prediction of the reliability parameters of such machines. In this research work, the reliability and maintainability analysis of the loading and haulage machines in the Sungun Copper Mine, considering the repair condition as multiple repairable units, was performed. For this purpose, the data necessary for the loading and haulage equipment including 2 loaders and 8 dump trucks for a 15-month period was collected and categorized in 10 operational units after the system and sub-systems of the department were determined. Initially, the time between failures (TBFs) and time to repair (TTR) for each unit was calculated. Then 20 sub-systems were developed. Primarily, the Stata software was utilized to carry out the heterogeneity test for all the sub-systems. In consequence, most of the sub-systems were regarded as the heterogeneous ones, except for 7 of them including the dump truck units 1, 2, 3, 4, 5, 7, and 8 in TBFs. Hence, "PHM" that is a covariate-based model displayed the heterogeneous group. Its reliability function was also estimated. For the next step, the trend tests were done on the non-heterogeneous sub-systems by means of the Minitab software. The homogeneous sub-systems with failure trend were modeled by “NHPP”. Afterwards, the non-trended sub-systems formed the data group. Later, the correlation tests were modeled by “HPP”. Finally, the reliability and maintainability functions were calculated with the 95% confidence level.
منابع مشابه
Maintainability measure based on operating environment, a case study: Sungun copper mine
The life cycle cost of a system is influenced by its maintainability. Maintainability is a design parameter, whose operational conditions can affect it significantly. Hence, the effects of these operational conditions should be quantified early in the design phase. The proportional repair model (PRM), which is developed based on the proportional hazard model (PHM), can be used to analyze mainta...
متن کاملFUZZY AHP METHOD FOR PLANT SPECIES SELECTION IN MINE RECLAMATION PLANS: CASE STUDY SUNGUN COPPER MINE
All steps of a mining project generally disturb the environment'soriginal condition during construction. Therefore, it is crucial toimplement an appropriate mine reclamation plan throughout all mineplanning stages from sustainable and environmental point of view.Planting the suitable plant species in each step of any reclamationplan and each area is one of the necessities in this respect.Select...
متن کاملfuzzy ahp method for plant species selection in mine reclamation plans: case study sungun copper mine
all steps of a mining project generally disturb the environment'soriginal condition during construction. therefore, it is crucial toimplement an appropriate mine reclamation plan throughout all mineplanning stages from sustainable and environmental point of view.planting the suitable plant species in each step of any reclamationplan and each area is one of the necessities in this respect.select...
متن کاملtechnical and legal parameters for determination of river boundary,( case study haraz river)
چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...
15 صفحه اولComparison of pseudo-static, Newmark and dynamic response analysis of the final pit wall of Sungun copper mine
Sungun Copper Mine is located in an area with a high level of seismic hazard. Most recently, the Ahar-Varzeqan earthquake with a magnitude of 6.2 on Richter scale occurred on August 11, 2012; at a distance about 40 kilometers away from the mine. Nevertheless, the seismic stability of the final pit wall has not been comprehensively reviewed. In this research, the southwestern wall of the final p...
متن کاملesp needs analysis of iranian ma students: a case study of university of isfahan
نیاز سنجی دانشجویان کارشناسی ارشد ایرانی در رابطه با زبان تخصصی: مطالعه ای در دانشگاه اصفهان هدف از این مطالعه بررسی نیازهای یادگیری زبان خارجی دانشجویان کارشناسی ارشد دانشجویان دانشگاه اصفهان در رشته های زیست شناسی، روانشناسی، تربیت بدنی، حسابداری و فلسفه ی غرب میباشد. در مجموع 80 دانشجودر پنج رشته ی متفاوت از دانشگاه اصفهان در این پژوهش شرکت داشتند.علاوه بر این هشتاد دانشجو،25 استاد دروس ت...
15 صفحه اولمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 10 شماره 4
صفحات 1045- 1059
تاریخ انتشار 2019-10-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023