Analysis of critical paths in a project network with random fuzzy activity times

نویسندگان

  • Abolfazl Kazemi Assistant Professor, Faculty of Industrial and Mechanical Engineering, Islamic Azad University (Qazvin Branch)
  • Ahmad Talebi M.Sc., Faculty of Industrial and Mechanical Engineering, Islamic Azad University (Qazvin Branch)
چکیده مقاله:

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activity times has been proposed. The activity times of a project are assumed to be random fuzzy. Linear programming formulation has been applied to determine the critical path. The critical path method (CPM) problem has been solved using the expected duration optimization model and the mean-variance model, along with Liu’s definition for random fuzzy variables. Furthermore, a numerical example problem is solved for illustrating the proposed method.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

analysis of critical paths in a project network with random fuzzy activity times

project planning is part of project management, which is relates to the use of schedules such as gantt charts to plan and subsequently report progress within the project environment. initially, the project scope is defined and the appropriate methods for completing the project are determined. in this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times

93 AIJ Modeling, Identification, Simulation and Control, Vol 48, No. 2, Fall 2016 Please cite this article using: Kazemi, A., Talebi, A., and Oroojeni Mohammad-Javad, M., 2016. “Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times”. Amirkabir International Journal of Modeling, Identification, Simulation and Control, 48(2), pp. 93–101. DOI: 10.22060/miscj.2016.831 URL...

متن کامل

Critical path analysis in the network with fuzzy activity times

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

a critical discourse analysis of the new york times and the tehran times news articles, covering the u.s.-led war in afghanistan

تحقیق حاضر متون خبری روزنامه های نیویورک تایمز و تهران تایمز را به صورت تحلیل انتقادی کلامی مورد بررسی قرارمی دهدکه درمورد جنگ به رهبری آ مریکا در افغانستان است. هدف از این تحقیق نشان دادن تاثیر ایدیولوژی و نگرشهای نویسندگان متون خبری است که ممکن است پنهان باشد. برای انجام این تحقیق 20 متن خبری) از هر روزنامه 10 متن خبری) به صورت تصادفی از سایت اینترنتی روزنامه های نیویورک تایمز و تهران تایمز ا...

15 صفحه اول

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 48  شماره 2

صفحات  93- 102

تاریخ انتشار 2016-11-21

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023