An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

نویسندگان

  • Armin Jabbarzadeh Department of Industrial Engineering, Iran University of Science and Technology, Tehran,Iran.
  • Mohsen Amiri Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
  • Seyed Jafar Sadjadi Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
چکیده مقاله:

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the first echelon and supply vessels in the second echelon.Additionally,the location of warehouse(s),optimal voyages and related schedules in both echelons are purposed.The total cost should be kept at a minimum and the need of operation regions and offshore installationsshould be fulfilled.A two-stage exact solution method, which is common for maritime transportation problems, is presented for small and medium-sized problems. In the first stage, all voyages are generated and in the second stage, optimal fleet composition, voyages and schedules are determined. Furthermore, optimal onshore base(s) to install central warehouse(s)and optimal operation region(s) to send offshore installation’s needs are decided in the second stage.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Approach for Reliable Facility Location/Network Design Problem with Link Disruption

Proposing a robust designed facility location is one of the most effective ways to hedge against unexpected disruptions and failures in a transportation network system. This paper considers the combined facility location/network design problem with regard to transportation link disruptions and develops a mixed integer linear programming formulation to model it. With respect to the probability o...

متن کامل

an integrated approach for reliable facility location/network design problem with link disruption

proposing a robust designed facility location is one of the most effective ways to hedge against unexpected disruptions and failures in a transportation network system. this paper considers the combined facility location/network design problem with regard to transportation link disruptions and develops a mixed integer linear programming formulation to model it. with respect to the probability o...

متن کامل

Location-Routing Problem with Fuzzy Time Windows and Traffic Time

The location-routing problem is a relatively new branch of logistics system. Its objective is to determine a suitable location for constructing distribution warehouses and proper transportation routing from warehouse to the customer. In this study, the location-routing problem is investigated with considering fuzzy servicing time window for each customer. Another important issue in this regard ...

متن کامل

location-routing problem with fuzzy time windows and traffic time

the location-routing problem is a relatively new branch of logistics system. its objective is to determine a suitable location for constructing distribution warehouses and proper transportation routing from warehouse to the customer. in this study, the location-routing problem is investigated with considering fuzzy servicing time window for each customer. another important issue in this regard ...

متن کامل

An Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network

One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...

متن کامل

An Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network

One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 12  شماره 1

صفحات  151- 165

تاریخ انتشار 2019-03-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023