Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we propose a Pareto approach to solve multi-objective job shop scheduling. The objective considered is to minimize the overall completion time (makespan) and total weighted tardiness (TWT). An effective simulated annealing algorithm based on proposed approach is presented to solve multi-objective job shop scheduling problems. An external memory of non-dominated solutions is considered to save and update the non-dominated solutions during the problem solving process. The parameters in the proposed algorithm are determined after conducting a pilot study. Numerical examples are used to evaluate and study the performance of the proposed algorithm.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

an algorithm for multi-objective job shop scheduling problem

scheduling for job shop is very important in both fields of production management and combinatorial op-timization. however, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. the combination of several optimization criteria induces additional complexity and new problems. in this paper, we pro...

متن کامل

Single Objective Evolutionary Algorithm for Flexible Job-shop Scheduling Problem

A meta-heuristic approach for solving the flexible job-shop scheduling problem (FJSP) is presented in this study. This problem consists of two sub-problems, the routing problem and the sequencing problem and is among the hardest combinatorial optimization problems. We propose a Evolutionary Algorithm (EA) for the FJSP. Our algorithm uses several different rules for generating the initial popula...

متن کامل

An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem

Flexible job shop scheduling problem (FJSP) is an extended traditional job shop scheduling problem, which more approximates to real scheduling problems. This paper presents a multi-objective genetic algorithm (GA) based on immune and entropy principle to solve the multi-objective FJSP. In this improved multi-objective GA, the immune and entropy principle is used to keep the diversity of individ...

متن کامل

A Hybrid Multi Objective Algorithm for Flexible Job Shop Scheduling

Scheduling for the flexible job shop is very important in both fields of production management and combinatorial optimization. However, it quit difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. The combining of several optimization criteria induces additional complexity and new problems. In this paper, a...

متن کامل

An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem

0360-8352/$ see front matter 2008 Elsevier Ltd. A doi:10.1016/j.cie.2008.07.021 * Corresponding author. E-mail address: [email protected] (X. Shao). Flexible job-shop scheduling problem (FJSP) is an extension of the classical job-shop scheduling problem. Although the traditional optimization algorithms could obtain preferable results in solving the monoobjective FJSP. However, they are very d...

متن کامل

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 2  شماره 3

صفحات  43- 53

تاریخ انتشار 2006-09-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023