A Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center

نویسندگان

  • D. Rahmani Department of Industrial Engineering, K. N. Toosi University of Technology, Tehran, Iran
  • R. Sahraeian College of Engineering, Department of Industrial Engineering, Shahed University, Tehran, Iran
  • Z. Abtahi College of Engineering, Department of Industrial Engineering, Shahed University, Tehran, Iran
چکیده مقاله:

This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a flexible open shop scheduling problem and a stochastic programming model. By considering the specific distribution function for uncertain variables, deterministic mixed integer linear programming (MILP) is developed such that the proposed problem can be solved by a linear programming solver in small size. Besides an effective heuristic method is proposed for the moderate size problem. To indicate the applicability of the proposed model, it has been applied to a real radiology center. The results from the proposed optimization models indicate an increase in outpatients’ satisfaction, as well as the improving of the efficiency and productivity of the radiology center.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

a stochastic model for project selection and scheduling problem

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

A Stochastic Model for Water Resources Management

Irrigation water management is crucial for agricultural production and livelihood security in many regions and countries throughout the world. Over the past decades, controversial and conflictladen water-allocation issues among competing municipal, industrial and agricultural interests have raised increasing concerns. Particularly, growing population, varying natural conditions and shrinking wa...

متن کامل

passivity in waiting for godot and endgame: a psychoanalytic reading

this study intends to investigate samuel beckett’s waiting for godot and endgame under the lacanian psychoanalysis. it begins by explaining the most important concepts of lacanian psychoanalysis. the beckettian characters are studied regarding their state of unconscious, and not the state of consciousness as is common in most beckett studies. according to lacan, language plays the sole role in ...

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 33  شماره 4

صفحات  598- 606

تاریخ انتشار 2020-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023