A Project Scheduling Method Based on Fuzzy Theory

نویسندگان

  • Ahmad Soltani Sharif University of Technology and Engineering Research Institute, Ministry of Agricultural Jahad, P. O. Box: 13445-754, Tehran, Iran
  • Rasoul Haji Department of Industrial Engineering, Sharif University of Technology, P. O Box: 11365-9414, Tehran, Iran
چکیده مقاله:

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modified backward pass (MBP). This approach, based on a linear programming (LP) problem, removes negative and infeasible solutions which can be generated by other methods in the backward pass calculation. We drive the general form of the optimal solution of the LP problem which enables practitioners to obtain the optimal solution by a simple recursive relation without solving any LP problem. Through a numerical example, calculation steps in this method and the results are illustrated.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Scheduling Optimization of Critical Chain Management Based on Fuzzy Theory

1,3 LIU Jianbing, DU Junshu, 3 REN Hong, Faculty of Economics and Management , Jiangxi University of Science and Technology, Ganzhou Jiangxi 341000, China,[email protected] School of Business of East China University of Science and Technology,Shanghai 200237,China, [email protected] 3 Faculty of Construction Management and Real Estate , Chongqing University, Chongqing 400030 , China, renho...

متن کامل

designing unmanned aerial vehicle based on neuro-fuzzy systems

در این پایان نامه، کنترل نرو-فازی در پرنده هدایت پذیر از دور (پهپاد) استفاده شده است ابتدا در روش پیشنهادی اول، کنترل کننده نرو-فازی توسط مجموعه اطلاعات یک کنترل کننده pid به صورت off-line آموزش دیده است و در روش دوم یک کنترل کننده نرو-فازی on-line مبتنی بر شناسایی سیستم توسط شبکه عصبی rbf پیشنهاد شده است. سپس کاربرد این کنترل کننده در پهپاد بررسی شده است و مقایسه ای ما بین کنترل کننده های معمو...

Project Cost Prediction Model Based on Fuzzy Theory

Project cost is the main factor contributing to the cost of construction, which accounts for a large proportion of the total investment. So strengthening the management and control of the project cost will be beneficial for the improvement of international competitiveness and conservation of social resource for construction enterprises. The article applies the basic principles of fuzzy mathemat...

متن کامل

A research on classification performance of fuzzy classifiers based on fuzzy set theory

Due to the complexities of objects and the vagueness of the human mind, it has attracted considerable attention from researchers studying fuzzy classification algorithms. In this paper, we propose a concept of fuzzy relative entropy to measure the divergence between two fuzzy sets. Applying fuzzy relative entropy, we prove the conclusion that patterns with high fuzziness are close to the classi...

متن کامل

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

A Constraint-Based Method for Project Scheduling with Time Windows

This paper presents a heuristic algorithm for solving RCPSP/max, the resource constrained project scheduling problem with generalized precedence relations. The algorithm relies, at its core, on a constraint satisfaction problem solving (CSP) search procedure, which generates a consistent set of activity start times by incrementally removing resource conflicts from an otherwise temporally feasib...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 1  شماره 1

صفحات  70- 80

تاریخ انتشار 2007-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023