A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

نویسندگان

  • M. Ataei School of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
  • M. M. Tahernejad School of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
  • R. Khalokakaie School of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
چکیده مقاله:

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality of the proposed plan will be eliminated. This paper presents a risk-averse decision-making tool to help mine planners in mining activities under price uncertainty. The objective is to propose mine planning in a way that a target Net Present Value (NPV) is guaranteed. In order to reach this goal, Information Gap Decision Theory (IGDT) is developed to hedge the mining project against the risk imposed by the information gap between the forecasted and actual price. The proposed approach is of low sensitivity to the price change over the life of mine, and can use the estimated prices with uncertainty. A case study at an existing iron mine demonstrates the performance of the proposed approach. The results obtained showed that the proposed method could provide a robust solution to mine planning under price uncertainty. Moreover, it was concluded that the method could present more reliable mine plans under condition of price uncertainty.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

Open Pit Mine Scheduling under Uncertainty: a Robust Approach

In order to carry out an open pit mining operation, planners must periodically prepare what is known as strategic mine plan. This is a tentative production schedule for the remaining life of the mine that defines which area of a mining reserve will be extracted, in what years this extraction will take place, which resources will be used for the extraction, and how the extracted material will be...

متن کامل

commodity price uncertainty propagation in open-pit mine production planning by latin hypercube sampling method

production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (npv) subject to some operational and technical constraints. this process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. the commodity price uncertainty is among ...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 9  شماره 2

صفحات  527- 537

تاریخ انتشار 2018-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.