A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
نویسندگان
چکیده مقاله:
One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of overestimation and underestimation of capital expenditure are causing huge problems. The former leads to estimating the value of projects less than the real value, and the latter causes to fail or postpone the project. In this paper, in order to achieve a reliable cost model, the technical and economic data of 15 open pit porphyry copper mines have been collected. The proposed cost model is developed based on stepwise multi variate regression . The R square of the presented model was 97.53% and indicated a proper fit on the data set. In addition, the mean absolute error with respect to the average capital cost of data set used in the modelling procedure was obtained ±8%. The results showed that this model is capable of estimating open pit porphyry copper mine capital expenditure in an acceptable range of error. One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of overestimation and underestimation of capital expenditure are causing huge problems. The former leads to estimating the value of projects less than the real value, and the latter causes to fail or postpone the project. In this paper, in order to achieve a reliable cost model, the technical and economic data of 15 open pit porphyry copper mines have been collected. The proposed cost model is developed based on stepwise multi variate regression . The R square of the presented model was 97.53% and indicated a proper fit on the data set. In addition, the mean absolute error with respect to the average capital cost of data set used in the modelling procedure was obtained ±8%. The results showed that this model is capable of estimating open pit porphyry copper mine capital expenditure in an acceptable range of error.
منابع مشابه
A genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملA continuous model for open pit mine planning∗
This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...
متن کاملA New Semi-Quantitative Approach to Open-Pit Mine Sustainability Assessment
Sustainability assessment has received numerous attentions in the mining industry. Mining sustainability includes the environmental, economic, and social dimensions, and a sustainable development is achieved when all these dimensions improve in a balanced manner. Therefore, to measure the sustainability score of a mine, we require an approach that evaluates all these three dimensions of mining ...
متن کاملA New Method for Improving Computational Cost of Open Information Extraction Systems Using Log-Linear Model
Information extraction (IE) is a process of automatically providing a structured representation from an unstructured or semi-structured text. It is a long-standing challenge in natural language processing (NLP) which has been intensified by the increased volume of information and heterogeneity, and non-structured form of it. One of the core information extraction tasks is relation extraction wh...
متن کاملA continuous framework for open pit mine planning
This paper proposes a newmathematical framework for the open pit mine planning problem, based on continuous functional analysis. The main challenge for engineers is to determine a sequence of nested profiles maximizing the net present value of the mining operation. The traditional models for this problem have been constructed by using binary decision variables, giving rise to large-scale combin...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 32 شماره 2
صفحات 346- 353
تاریخ انتشار 2019-02-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023