A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

نویسندگان

  • M. Seifi Industrial Engineering, Sharif University of Technology
چکیده مقاله:

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategies. In this paper, we present a new bi-objective model for the MRCPSP that maximizes the net present value (NPV) and minimizes the holding cost of activities completed by the projects’ completion time. For better adoption with real conditions, we consider four different payment models for positive cash flow. To verify the proposed model, a number of numerical examples are solved in small sizes and the related computational results are illustrated in terms of schedules. Finally, a meta-heuristic algorithm based on simulated annealing (SA) is utilized to solve our four payment proposed models in various sizes and the obtained results were analyzed.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows

In this paper, the multi-mode resource constrained project scheduling problem with discounted cash flows is considered. The objective is the maximization of the net present value of all cash flows. Time value of money is taken into consideration, and cash inand outflows are associated with activities and/or events. The resources can be of renewable, nonrenewable, and doubly constrained resource...

متن کامل

A New Bi-objective Model for a Multi-mode Resource-constrained Project Scheduling Problem with Discounted Cash Flows and Four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Solving a multi-objective multi-mode resource-constrained project scheduling problem with discounted cash flows

This paper presents a multi-objective multi-mode resource-constrained project scheduling problem (MRCPSP) with positive and negative cash flows. We consider the objectives of the net present value (NPV) maximization and robustness maximization along by makespan minimization. Furthermore, to make a model close to the real world situations, two types of commonly used payment models are considered...

متن کامل

A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities

In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 21  شماره 4

صفحات  347- 360

تاریخ انتشار 2008-11-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023