A Multi-Year Scenario-Based Transmission Expansion Planning Model Incorporating Available Transfer Capability

نویسندگان

  • Tohid Akbari Department of Electrical Engineering, Pooyesh Institute of Higher Education, Qom, Iran
چکیده مقاله:

This paper presents a multi-year scenario-based methodology for transmission expansion planning (TEP) in order to enhance the available transfer capability (ATC). The ATC is an important factor for all players of electricity market who participate in power transaction activities and can support the competition and nondiscriminatory access to transmission lines among all market participants. The transmission expansion planning studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Latin hypercube sampling (LHS) method has been applied for generating different scenarios related to the load uncertainty. The objective function in the TEP model is to minimize the sum of investment costs (IC) and the expected operation costs (OC). Both ATC and TEP models are represented based on AC power flow constraints which are more accurate compared with the widely-used DC approach. In this respect, the nonlinear terms in power flow equations are linearized in order to obtain the efficient solutions by existing commercial solvers that can guarantee the achievement to the global optimal solution using branch and bound technique. The proposed model is applied to the IEEE 24-bus Reliability Test System and the results obtained show the efficiency, tractability and applicability of the proposed model.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

Transmission expansion planning based on merchandizing surplus of transmission lines

This paper proposes an optimal transmission expansion planning (TEP) which is based on determining share of each line in merchandizing surplus (MS) of system, determining by Independent System Operator (ISO). The more share of a line in MS of system denotes the priority of a line for expansion. The procedure of determining MS of each line in a power system is based on determining the MS share o...

متن کامل

A Mathematical Model for Multi-Region, Multi-Source, Multi-Period Generation Expansion Planning in Renewable Energy for Country-Wide Generation-Transmission Planning

Environmental pollution and rapid depletion are among the chief concerns about fossil fuels such as oil, gas, and coal. Renewable energy sources do not suffer from such limitations and are considered the best choice to replace fossil fuels. The present study develops a mathematical model for optimal allocation of regional renewable energy to meet a country-wide demand and its other essential as...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

transmission expansion planning based on merchandizing surplus of transmission lines

this paper proposes an optimal transmission expansion planning (tep) which is based on determining share of each line in merchandizing surplus (ms) of system, determining by independent system operator (iso). the more share of a line in ms of system denotes the priority of a line for expansion. the procedure of determining ms of each line in a power system is based on determining the ms share o...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 52  شماره 1

صفحات  12- 12

تاریخ انتشار 2020-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023