A mathematical model for balancing (cost-time-quality and environmental risks) in oil and gas projects and solving it by multi-objective Bee Colony Algorithm

نویسندگان

  • Ayub Rahimzadeh Department of Industrial Management, Kermanshah Branch, Islamic Azad University, Kermanshah, Iran.
  • Heresh Soltanpanah Department of Management, Sanandaj Branch, Islamic Azad University, Sanandaj, Iran.
  • Hossein Ali Heydari Department of Industrial Management, Kermanshah Branch, Islamic Azad University, Kermanshah, Iran.
چکیده مقاله:

Today, in large projects such as constructing oil, gas and petrochemical refineries, it is inevitable to use modern management methods and project timing. On the other hand, in classic scheduling case, the focus is on balance between time and cost of carrying out projects, which in such a situation, one of possible solutions to shorten time of implementing project is to accelerate activities. This acceleration can affect the quality of conducting projects and environmental impacts, in addition to impose more costs. Hence, in such studies, environmental impacts and quality of activities were also considered as new indicators in case of project time-cost balance. There has been proposed a new mathematical model with four indicators: cost, time, quali-ty and environmental impacts. The provided model is a multi-objective mathematical model of zero-and-one programming type that despite traditional models, in which there is only considered an implementation mode for carrying out activities and a pre-conditional relationship between activities, modes of implementing activities are as multi-form and the dependence relationship between the activities is a generalized pre-requisite. Including the relationships brings the problem closer to the real world. Because of NP-hard of the problem in large dimensions and the necessity of using meta-heuristic Algorithms, we used MOBEE algorithm to solve the model.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Presenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm

The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...

متن کامل

the innovation of a statistical model to estimate dependable rainfall (dr) and develop it for determination and classification of drought and wet years of iran

آب حاصل از بارش منبع تأمین نیازهای بی شمار جانداران به ویژه انسان است و هرگونه کاهش در کم و کیف آن مستقیماً حیات موجودات زنده را تحت تأثیر منفی قرار می دهد. نوسان سال به سال بارش از ویژگی های اساسی و بسیار مهم بارش های سالانه ایران محسوب می شود که آثار زیان بار آن در تمام عرصه های اقتصادی، اجتماعی و حتی سیاسی- امنیتی به نحوی منعکس می شود. چون میزان آب ناشی از بارش یکی از مولفه های اصلی برنامه ...

15 صفحه اول

A new multi-objective mathematical model for hazardous waste management considering social and environmental issues

Hazardous waste management incorporates collection, separation, treatment, recycling and disposal of hazardous wastes. In this paper, a new multi-objective mixed integer model is presented for hazardous waste collection problem. The model aims to minimize transportation and construction costs, and environmental and population risks in hazardous waste management systems. This model is applied in...

متن کامل

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

passivity in waiting for godot and endgame: a psychoanalytic reading

this study intends to investigate samuel beckett’s waiting for godot and endgame under the lacanian psychoanalysis. it begins by explaining the most important concepts of lacanian psychoanalysis. the beckettian characters are studied regarding their state of unconscious, and not the state of consciousness as is common in most beckett studies. according to lacan, language plays the sole role in ...

Solving a mathematical model with multi warehouses and retailers in distribution network by a simulated annealing algorithm

Determination of shipment quantity and distribution problem is an important subject in today’s business. This paper describes the inventory/distribution network design. The system addresses a class of distribution network design problem, which is characterized by multiple products family, multiple warehouses and retail-ers. The maximum capacity of vehicles and warehouses are also known. The res...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 4  شماره 4

صفحات  51- 66

تاریخ انتشار 2019-10-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023