A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study

نویسندگان

  • A. Jafarpour Department of Mining and Metallurgical Engineering, Yazd University, Yazd, Iran
  • J. Abdollahei Sharif Department of Mining Engineering, Faculty of Engineering, Urmia University, Urmia, Iran
  • S. Yousefi Faculty of Industrial Engineering, Urmia University of Technology, Urmia, Iran
چکیده مقاله:

The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculations related to mining capabilities on it. There are some factors effective in the determination of an optimal BS including the metal content, estimation error, recovery percentage, mining ability, safety, and dilution. In this work, an optimal BS is determined using a two-stage approach. In the proposed approach, the Fuzzy Delphi Analytic Hierarchy Process (FDAHP) and Fuzzy Multi-Objective Optimization by Ratio Analysis (FMOORA) methods are used. In the first phase, the weight of each criterion is calculated based on the opinions of the experts using the FDAHP method. In the second phase, the FMOORA method is applied in order to determine a suitable BS for the design and operation of mining considering the extracted weights in the previous phase. The block model of the Sungun copper mine is studied as a case study to evaluate the capability of the proposed approach. The results of implementation of this approach are desirable because of converting the opinions of the experts to fuzzy values, weighing the experts according to the experience and technical knowledge, weighting the criteria by FDAHP, and choosing the optimal option with FMOORA. Furthermore, the 12.5×12.5×12.5 m3 block (A5) is chosen as an appropriate BS, which is compatible with the real conditions of the studied mine.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

Use of a mixed integer programming model to achieve an optimum size of blast block in open-pit mining with regard to size of mineable block using fuzzy logic approach

In this paper, we present an integrated model to find the optimum size of blast block that uses (i) a multi-criteria decision-making method to specify the applicable size of the mineable block; (ii) a linear programming method for the selection of the blasted areas to be excavated and in deciding the quantity of ores and wastes to be mined from each one of the selected blocks. These two methods...

متن کامل

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

متن کامل

A New Semi-Quantitative Approach to Open-Pit Mine Sustainability Assessment

Sustainability assessment has received numerous attentions in the mining industry. Mining sustainability includes the environmental, economic, and social dimensions, and a sustainable development is achieved when all these dimensions improve in a balanced manner. Therefore, to measure the sustainability score of a mine, we require an approach that evaluates all these three dimensions of mining ...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

Applying an integrated fuzzy gray MCDM approach: A case study on mineral processing plant site selection

The accurate selection of a processing plant site can result in decreasing total mining cost. This problem can be solved by multi-criteria decision-making (MCDM) methods. This research introduces a new approach by integrating fuzzy AHP and gray MCDM methods to solve all decision-making problems. The approach is applied in the case of a copper mine area. The critical criteria are considered adja...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 11  شماره 2

صفحات  611- 627

تاریخ انتشار 2020-04-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023