A Genetic Based Scheduling Algorithm for the PHSP with Unequal Batch Size Inbound Trailers
نویسنده
چکیده مقاله:
This paper considers the parcel hub scheduling problem (PHSP) with unequal batch size inbound trailers, which is a combinatorial optimization problem commonly found in a parcel consolidation terminal in the parcel delivery industry (PDI). The problem consists of processing a large number of inbound trailers at a much smaller number of unload docks. The parcels in the inbound trailers must be unloaded, sorted and transferred to the load docks, and loaded onto the outbound trailers. Because the transfer operation is labor intensive and the PDI operates in a time-sensitive environment, the unloading, sorting, transferring, and loading of the parcels must be done in such a way as to minimize the timespan of the transfer operation. A genetic algorithm is used to solve the PHSP. An experimental analysis shows that the algorithm is able to produce solution results that are within 17% of the lower bound, 16% better than a competing heuristic, and 24% better than random scheduling.
منابع مشابه
Genetic Algorithm for Large-Size Multi-Stage Batch Plant Scheduling
This paper presents a heuristic approach based on genetic algorithm (GA) for solving large-size multi-stage multi-product scheduling problem (MMSP) in batch plant. The proposed approach is suitable for different scheduling objectives, such as total process time, total flow time, etc. In the algorithm, solutions to the problem are represented by chromosomes that will be evolved by GA. A chromoso...
متن کاملRole of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm
Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...
متن کاملA Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 4 شماره 3
صفحات 167- 182
تاریخ انتشار 2010-11-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023