A Bi-Level Meta-heuristic Approach for a Hazardous Waste Management Problem

نویسندگان

  • Mehrzad Navabakhsh School of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
چکیده مقاله:

This study concentrates on designing a medical waste management system with a hierarchical structure, including a local government and a waste management planner. The upper-level seeks to design and control the waste management facilities by minimizing the environmental risks related to the disposal of medical waste. While the lower-level model is to determine the waste collection plans by only minimizing its total operational costs. Therefore, this study develops a bi-level mathematical model, in which the benefits of both the stakeholders are taken into account. As this problem poses difficulty in searching for the optimal solution, a bi-level meta-heuristic based on the Genetic Algorithm (GA) is employed for solving the problem. Finally, a real case study is conducted to show that the proposed model and solution approach is practical and efficient. Finally, a real case study is conducted to show that the proposed model and solution approach is practical and efficient.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a Multi-Objective Location-Routing Problem for Hazardous Waste Management Industrial

Industrial hazardous materials (hazmat) are byproduct of industrial production and include hazardous goods, such as flammable, toxic and corrosive materials that pose a risk to the environment.Hazardous waste management includes collection, transportation, treatment, recycling and disposal of industrial hazardous material in an organized manner. With the increasing industrialization of countrie...

متن کامل

A Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

متن کامل

A model for distribution centers location-routing problem on a multimodal transportation network with a meta-heuristic solving approach

Nowadays, organizations have to compete with different competitors in regional, national and international levels, so they have to improve their competition capabilities to survive against competitors. Undertaking activities on a global scale requires a proper distribution system which could take advantages of different transportation modes. Accordingly, the present paper addresses a location-r...

متن کامل

Solving a bi-objective location routing problem by a NSGA-II combined with clustering approach: application in waste collection problem

It is observed that the separated design of location for depots and routing for servicing customers often reach a suboptimal solution. So, solving location and routing problem simultaneously could achieve better results. In this paper, waste collection problem is considered with regard to economic and societal objective functions. A non-dominated sorting genetic algorithm (NSGA-II) is used to l...

متن کامل

A Bi - Objective Model and Efficient Heuristic for Hazardous Material Inventory Routing Problem

Two types of decisions that directly affect the performance of a distribution system is the vehicle routing and inventory assignment. These problems have been studied separately for many years. The inventory routing problem (IRP) is integration of above mentioned distribution problems. In the other words, IRP assumes each customer maintains a local inventory of a product and consumes a certain ...

متن کامل

Hazardous Materials & Hazardous Waste Management

The Hazardous Material Removal Program will provide all academic departments and faculty with the opportunity to dispose of unneeded hazardous chemicals and radioactive material with no EH&S recharge. The disposal program will be organized building by building and advanced notice will be given to each department. Radioactive waste and materials along with routine chemical waste will be collecte...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 33  شماره 7

صفحات  -

تاریخ انتشار 2020-07-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023