مدل سازی و حل مساله زمانبندی کار کارگاهی با زمانهای آماده‌سازی وابسته به توالی

نویسندگان

چکیده مقاله:

  In recent decade, many researches has been done on job shop scheduling problem with sequence dependent setup times (SDSJSP), but with respect to the knowledge of authors in very few of them the assumption of existing inseparable setup has been considered. Also, in attracted metaheuristic algorithms to this problem the Particle Swarm Optimization has not been considered. In this paper, the ISDSJSP with makespan minimization is considered. For this problem an MILP model has been developed and a PSO algorithm has been applied to solve it. In order to improve final solution obtained by PSO a simulated annealing algorithm has been applied. The proposed hybrid algorithm (HPSO) has been applied on some generated benchmark problems and the results indicate the effectiveness and efficiency of the proposed hybrid PSO with respect to two other algorithms

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

مدل سازی و حل مساله زمانبندی کار کارگاهی با زمانهای آماده سازی وابسته به توالی

در یک دهه اخیر تحقیقات نسبتا کمی بر روی مساله زمانبندی کار کارگاهی با زمان های آماده سازی وابسته به توالی جدایی ناپذیر (isdsjsp) انجام شده است. در زمینه حل این مساله نیز الگوریتم بهینه سازی دسته ذرات (pso) مورد توجه قرار نگرفته است. در این مقاله مساله isdsjsp با تابع هدف کمینه سازی زمان پایان تمام کارها مدنظر قرار گرفته و یک مدل برنامه ریزی خطی عدد صحیح مختلط و یک الگوریتم ترکیبی pso برای آن ار...

متن کامل

بکارگیری الگوریتم ترکیبی بهینه سازی دسته ذرات برای حل مساله سنتی زمانبندی کار کارگاهی

The classical Job Shop Scheduling Problem (JSSP) is NP-hard problem in the strong sense. For this reason,   different metaheuristic algorithms have been developed for solving the JSSP in recent years. The Particle Swarm Optimization (PSO), as a new metaheuristic algorithm, has applied to a few special classes of the problem.  In this paper, a new PSO algorithm is developed for JSSP. First, a pr...

متن کامل

زمانبندی جریان کارگاهی مونتاژ با زمان آماده‌سازی وابسته به توالی و زمان حمل و نقل

In this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. This problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. In this mode...

متن کامل

مدل سازی مساله زمانبندی تولید جریان کارگاهی چند حالته با منابع محدود

در مسائل زمانبندی معمولا زمان پردازش عملیات های هر کار مشخص و ثابت در نظر گرفته می شود. درادبیات زمانبندی پروژه بسیار تاکید شده است که زمان هر فعالیت/عملیات می تواند گاهی چند حالته باشد و باتخصیص مقداری بیشتری از منابع به یک فعالیت، زمان پردازش آن نیز کاهش یابد. در اینگونه مسائل علاوه برزمانبندی فعالیت ها باید تخصیص منابع محدود در دسترس به فعالیت ها نیز انجام شود. این ضعف در ادبیاتمسائل زمانبند...

متن کامل

مدل های عمومی برای مسائل توالی جریان کارگاهی ترکیبی با زمان های آماده سازی وابسته به توالی

در این مقاله دو مدل برنامه ریزی مختلط عدد صحیح (MILP) برای جریان کارگاه ترکیبی (HFS) با زمان های آماده سازی وابسه به توالی ارائه می شود. در مدل اول فرض شده که ماشین های موجود در هر مرحله یکسان (I) بوده اما در مدل دوم این ماشین ها مختلف در نظر گرفته شده اند. همچنین در این مقاله تفاوت بین مدلهای ارائه شده بر اساس راحتی بکارگیری و نیز قابلیت توسعه و مسائل گوناگون مورد بحث قرار گرفته است. یکی از مه...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 21  شماره 4

صفحات  103- 115

تاریخ انتشار 2011-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

کلمات کلیدی برای این مقاله ارائه نشده است

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023