ارانه الگوی رتبه بندی HSE پیمانکاران پیش از عقد قرارداد بر اساس سطح پیمان

نویسندگان

  • جعفری, محمد جواد دانشگاه شهید بهشتی- دانشکده بهداشت
  • ماپار, مهسا کارشناسی ارشد مدیریت HSE، واحد علوم و تحقیقات تهران، دانشگاه آزاد اسلامی، تهران، ایران
  • منصوری, نبی اله دانشگاه علوم و تحقیقات تهران- دانشکده محیط زیست و انرژی
چکیده مقاله:

  Background and aims: ‏ Evaluation of the contractor’s HSE is a key issue for the employer that influences the selection of a contractor. An appropriate method of assessment can play a significant role in the selection of qualified contractors. This paper presents a new method for ranking of contractor’s HSE at pre-contract stage of a project.   Methods: To develop this new evaluation method, the c ontracts were categorized in 3 groups of advanced, medium and preliminary. In order to pre-assess the contractors’ status prior to their participation in bids, an HSE data questionnaire was developed in the frame of 40 questions. Then 29 indices were developed for primary HSE assessment based on International Association of Oil and Gas Producers (OGP). Because the role of each index is different in each category of contracts thus, seven elements of HSE model were weighted on the basis of contract category. Contractors scoring system was developed in each category of contract based on the obtained weights. Finally the contractors were categorized in four groups of A, B, C and D based on their scores obtained from their HSE evaluation.   Results: The results revealed that each term of HSE have different weight in each contract category. In advanced (group 1) and medium (group 2) contracts, the leadership plus commitment (coefficient of 4.9 and 4.3 respectively) and in preliminary contracts the execution and monitoring (coefficient 3.3) have the highest weights. The Strategy and goals have the minimum weight in all 3 types of contracts (e.g. 4.4 in advanced, 3.6 in medium and 2.4 in preliminary contracts). The minimum score required for an A group contractor to get an advanced contract is 537 while the maximum score of a D group contractor to obtain a preliminary contract is 123.   Conclusion: The new developed method is able to rank the HSE of contractors prior to sign the contract.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ارانه الگوی رتبه بندی hse پیمانکاران پیش از عقد قرارداد بر اساس سطح پیمان

زمینه و هدف: ارزیابیhse پیمانکار یکی از موضوعات مهم مورد نظر کارفرما به شمار می رود که در انتخاب یک پیمانکار نقش دارد. روش مناسب ارزیابی می تواند نقش مهمی در انتخاب پیمانکار شایسته بازی کند. در این مقاله یک روش جدید ارزیابی hse پیمانکاران در مرحله پیش از عقد قرار داد ارائه شده است. روش بررسی: به منظور تدوین این روش جدید، پیمان ها به سه رده مختلف پیشرفته، متوسط و مقدماتی تقسیم بندی شدند. سپس پرس...

متن کامل

ارائه الگویی برای انتخاب پیمانکاران از دیدگاه HSE

Introduction: Quality and efficiency of health, safety, and environment (HSE) management systems play a vital role in achieving their goals. Considering outputs and objective achievement make continuous improvement of services and products, internal and external customer satisfaction, adopting a systematic way for performing various tasks, system performance and analysis very important. The pre...

متن کامل

ارائه یک الگوی کاربردی برای ارزیابی عملکرد HSE پیمانکاران ساخت و ساز

Background and Aims: Performance assessment of the HSE-MS in the contractors is a key step in the contractor’s management process and it forms the basis of continuous improvement. Therefore, the present study aims to develop a practical model for the performance assessment of Health, Safety and Environment Management System (HSE-MS) of construction contractors. Methods: In this an...

متن کامل

شناسایی و رتبه بندی چالش های پیش روی هوشمند سازی مدارس بر اساس تکنیک AHP

پژوهش حاضر، با هدف شناسایی چالش های پیش روی هوشمند سازی مدارس و اولویت بندی آنها در سطح دبیرستان های مرحله اول شهر بابل از دیدگاه مدیران انجام شد. این پژوهش از نظر هدف کاربردی و از نظر روش توصیفی و از نوع زمینه یابی بوده است. به منظور دست یافتن به هدف، چالش های هوشمند سازی مدارس در چهار دسته عوامل انسانی، زیر ساختی و فنی، اقتصادی و عوامل فرهنگی-آموزشی بعنوان مدل مفهومی تحقیق حاضر مورد بررسی قرا...

متن کامل

قرارداد پیش فروش آپارتمان، عقد استصناع یا قرارداد خصوصی موضوع ماده10قانون مدنی

قرارداد های پیش فروش آپارتمان به لحاظ رشد شهرنشینی و گرایش مردم به آپارتمان نشینی که خود معلول عوامل زیادی می باشد ، در جامعه ی کنونی ایران بطور گسترده ای در میان مردم رواج یافته وانبوه سازان و شرکتهای بزرگ ساختمانی وسازندگان شهرک ها ومجتمع ها و آپارتمان های مسکونی وتجاری وخدماتی و حتی دستگاههای دولتی از طریق پیش فروش آپارتمان قبل از شروع عملیات ساختمانی سعی در جمع آوری سرمایه لازم برای این فعا...

متن کامل

رتبه ‏بندی عملکرد HSE شرکت‌های گاز با استفاده از تکنیک تصمیم‏ گیری چند شاخصه

زمینه و هدف : صنایع نفت و گاز با توجه به کیفیت و کمیت مواد خام، بینابینی و محصولات جانبی و نهایی، هم­چنین دارا­بودن سه مشخصه پیچیدگی بالا، قابلیت انعطاف پایین و آسیب‏پذیری زیاد از دیدگاه HSE جزء صنایع بحرانی محسوب شده و بروز یک حادثه در آن می­تواند از جنبه‏های انسانی، زیست محیطی و اقتصادی فاجعه‏بار باشد. هدف اصلی از این پژوهش ارزیابی کمی شرکت­های گاز از لحاظ وضعیت عملکرد سیستم مدیریت HSE و رتبه...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 10  شماره 2

صفحات  65- 78

تاریخ انتشار 2013-07

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

کلمات کلیدی برای این مقاله ارائه نشده است

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023