M. Rahmanpour
School of mining, college of engineering, University of Tehran, Iran
[ 1 ] - A New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling...
Co-Authors