Aregawi Yemane
Industrial Engineering, Faculty of mechanical and Industrial Engineering , Bahirdar University ,Bahirdar , Ethiopia
[ 1 ] - Productivity Improvement through Line Balancing by Using Simulation Modeling
The typical problems facing garment manufacturers are long production lead time, bottlenecking, and low productivity. The most critical phase of garment manufacturing is the sewing phase, as it generally involves a number of operations or for the simple reason that it’s labor intensive. In assembly line balancing, allocation of jobs to machines is based on the objective of minimizing the workfl...
[ 2 ] - Performance Measurement and Improvement of Healthcare Service Using Discrete Event Simulation in Bahir Dar Clinic
This paper deals with the service performance analysis and improvement using discrete event simulation has been used. The simulation of the health care has been done by arena master development 14-version software. The performance measurement for this study are patients output, service rate, service efficiency and it is directly related to waiting time of patients in each service station, work ...
[ 3 ] - Productivity Improvement of BOB T-shirt through Line Balancing Using Control Limit analysis and discrete event simulation (Case study: - MAA Garment and Textile Factory)
This study deals with line balancing of BOB T-shirt model with the help of control limit analysis and discrete event simulation of the assembly lines. In this study control limit analysis is used to measure the performance of the assembly line and used to show the bottleneck operations of the assembly line and line balancing technique improves the productivity of the sewing line of the model. ...
Co-Authors