Mohammadreza Badalpur
Industrial Engineering College, Islamic Azad University, South Tehran Branch, Tehran, Iran.
[ 1 ] - Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
Co-Authors