Fatemeh Sogandi
Ph.D. Student, Department of Industrial Engineering, Amirkabir University of Technology
[ 1 ] - A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits
Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...
[ 2 ] - Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
[ 3 ] - Multi-Objective Economic-Statistical Design of VSSI-MEWMA-DWL Control Chart with Multiple Assignable Causes
This paper proposes a multi-objective model for the economic-statistical design of the variable sample size and sampling interval multivariate exponentially weighted moving average control chart by using double warning lines. The Markov chain approach is used to obtain the statistical properties. We extend the Lorenzen and Vance cost function considering multiple assignable causes and multivari...
Co-Authors