Risk assessment of urban network using traffic indicators determines vulnerable links with high danger of traffic incidents. Thus Determination of an appropriate methodology remains a big challenge to achieve this objective. This paper proposed a methodology based on data fusion concept using Fuzzy-AHP and TOPSIS to achieve this aim. The proposed methodology tries to overcome two main problems, first of all using Fuzzy AHP for weight estimation of risk indicator, overcomes the problem of some famous weighting method such as AHP that uses limited scale of Saaty (1-9) for weight estimation. Because in risk assessment decision maker prefer to compare criteria with a range instead of using exact number such as Saaty scale As a result fuzzy triangular number was proposed in our methodology. What’s more using TOPSIS method is proposed for risk score estimation respecting estimated weight, because all input risk data are numeric furthermore risk evaluation would be done using distance from ideal solution.To test the proposed methodology an urban network in North of Washington was selected as pilot area. In the next step input criteria such as annual average daily traffic (AADT index), accident severity (IR index), average slope and closeness to critical place (that need traffic controlling such as school) were determined as risk indicators using Iranian traffic organization expert’s idea then nonlinear-Fuzzy-AHP was used to estimate weight of input criteria. Estimated weight entered to TOPSIS method to determine vulnerable links that are in high danger of traffic incidents.
similar resources
Access Network Selection in a Heterogeneous Environment Using the AHP and Fuzzy TOPSIS Methods
The problem of network selection across heterogeneous wireless networks has recently received much attention because of a drive for converged communication systems. However, since the selection of an access network depends on several parameters with different relative importance, such as the network and the application characteristics, the user preferences, the service cost, etc, it is a diffic...
full textConstruction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Construction projects are initiated in dynamic environment which result in circumstances of high uncertainty and risks due to accumulation of many interrelated parameters. The purpose of this study is to use novel analytic tools to evaluate the construction projects and their overall risks under incomplete and uncertain situations. It was also aimed to place the risk in a proper category and pr...
full textDevelopment of a human error risk assessment model in high priority emergency situation using TOPSIS, FUZZY-AHP and CREAM method
Introduction: Emergencies are unforeseen and unpredictable situations. In these situations, people’s performance is affected by various factors that cause stress. People’s performance in such situations can also affect human error probability. The purpose of this study was to evaluate human error in emergency situations based on the fuzzy CREAM and Fuzzy Analytical Hierarchy Process (FAHP). Ma...
full textSelection of Agricultural Aircraft Using Ahp and Topsis Methods in Fuzzy Environment
Considering the difficulty and complexity involved in choosing an agricultural aircraft, it is proposed to rank agricultural aircraft based on linguistic evaluations of their qualities. Aiming this, it is used an algorithm based on the Analytical Hierarchy Process (AHP) method and in the Technique of Order of Preference by Similarity to Ideal Solution (TOPSIS). The linguistic parameterization i...
full textProject Selection by Using Fuzzy AHP and TOPSIS Technique
In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...
full textPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
full textMy Resources
Journal title
volume 6 issue None
pages 73- 86
publication date 2015-09
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023