UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach

Authors

  • M. Jamshidi Mining and Metallurgical Engineering Department, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran
  • M. Osanloo Mining and Metallurgical Engineering Department, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran
Abstract:

The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considered with the purpose of optimizing the blending. These elements and blending methods have considerable effects on the quality of the final product. In this paper, a new approach is introduced to determine BEV in multi-element deposit with two types of profitable and penalty elements by considering the effect of blending on BEV. Consequently, the ultimate pit limits (UPLs) will be determined based on these conditions. The developed model is tested in the Gol-e-Gohar No.2 iron-ore mine, and the mine UPLs is determined. The results obtained showed that the mineable reserve of the pit increased by 3% when the effects of both types of elements are considered. In order to investigate the effect of grade uncertainty on BEV, twenty realizations of the ore block are generated using the sequential Gaussian simulation approach. The UPLs of all the realizations are determined using the developed BEV-calculation method, and the pit limits with different probabilities of occurrence are determined. The total mineable reserve varied between 20,380 and 46,410 million tons. The exploitation of mine should start with the smallest pit (100% probability). The largest pit should be considered as a guide for surface-facility locating.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Push Back Design in Two-element Deposits Incorporating Grade Uncertainty (RESEARCH NOTE)

Push back design as a complex task, is one of the major steps in the open pit mines planning. Push backs can be generated by varying economic factors such as commodity price, mining cost, processing cost, etc. Another important issue in generating push backs is grade uncertainty, which can cause the problem be more complex. Conventional methods of push back design ignore grade uncertainty. To o...

full text

solution of security constrained unit commitment problem by a new multi-objective optimization method

چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...

A new solving approach for fuzzy multi-objective programming problem in uncertainty conditions by ‎using semi-infinite linear programing

In practice, there are many problems which decision parameters are fuzzy numbers, and some kind of this problems are formulated as either possibilitic programming or multi-objective programming methods. In this paper, we consider a multi-objective programming problem with fuzzy data in constraints and introduce a new approach for solving these problems base on a combination of the multi-objecti...

full text

detection of volatile compounds of medicinal plants with some nano-sorbents using modified or new methodologies and investigation of antioxidant activity of their methanolic extracts

in this work, a novel and fast method for direct analysis of volatile compounds (davc) of medicinal plants has been developed by holding a filament from different parts of a plant in the gc injection port. the extraction and analysis of volatile components of a small amount of plant were carried out in one-step without any sample preparation. after optimization of temperature, extraction time a...

A New Compromise Decision-making Model based on TOPSIS and VIKOR for Solving Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on a new method, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. In this compromise programming method, two concepts are considered simultaneously. First of them is that the optimal ...

full text

A Compromise Decision-making Model for Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on the technique for order preference through similarity ideal solution (TOPSIS) methodology, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. This compromise programming method is ba...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 9  issue 1

pages  61- 72

publication date 2018-01-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023