TUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION
author
Abstract:
key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there are nonlinear and unknown relationships between rock properties and TBM penetration rate. Relevance vector regression (RVR) is one of the robust artificial intelligence algorithms proved to be very successful in recognition of relationships between input and output parameters. The aim of this paper is to show the application of RVR in prediction of TBM performance. The model was applied to available data given in open source literatures. In this model, uniaxial compressive strengths of the rock (UCS), the distance between planes of weakness in the rock mass (DPW) and rock quality designation (RQD) were utilized as the input parameters, while the measured TBM penetration rates was the output parameter. The performances of the proposed predictive model was examined according to two performance indices, i.e., coefficient of determination (R2) and mean square error (MSE). The obtained results of this study indicated that the RVR is a reliable method to predict penetration rate with a higher degree of accuracy.
similar resources
Estimation of penetration rate of tunnel boring machines using Monte-Carlo simulation method
One of the most important parameters used for determining the performance of tunnel boring machines (TBMs) is their penetration rate. The parameters affecting the penetration rate can be divided in two categories. The first category is the controllable parameters such as the TBM technical characteristics, and type and geometry of the tunnel, and the second one is the uncontrollable parameters s...
full textAn Analysis of Relevance Vector Machine Regression
The relevance vector machine (RVM) is a Bayesian framework for learning sparse regression models and classifiers. Despite of its popularity and practical success, no thorough analysis of its functionality exists. In this paper we consider the RVM in the case of regression models and present two kinds of analysis results: we derive a full characterization of the behavior of the RVM analytically ...
full textRelevance vector machine for depression prediction
The objective and automated monitoring of depression using behavioral signals is confounded by the wide clinical profile of this commonly occurring mood disorder. This paper introduces Relevance Vector Machines, a novel method for predicting clinical depression scores from paralinguistic cues. It highlights many of the advantages RVM can offer depression prediction; sparsity, implicit noise cha...
full textTunnel boring machine positioning automation in tunnel construction
Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...
full textRelevance vector machine and multivariate adaptive regression spline for modelling ultimate capacity of pile foundation
This study examines the capability of the Relevance Vector Machine (RVM) and Multivariate Adaptive Regression Spline (MARS) for prediction of ultimate capacity of driven piles and drilled shafts. RVM is a sparse method for training generalized linear models, while MARS technique is basically an adaptive piece-wise regression approach. In this paper, pile capacity prediction models are developed...
full textSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
full textMy Resources
Journal title
volume 9 issue 2
pages 343- 353
publication date 2019-04
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023