Abstract:

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the results are used in second step of the model, which determine a sequence between jobs by the aim of minimizing the total completion time. At the end a numerical example is presented and solved by the Lingo 8.0 mathematical software.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Scheduling jobs with chain precedence constraints and deteriorating jobs

In this paper we consider a single machine scheduling problem with deteriorating jobs. By deteriorating jobs, we mean that the processing time of a job is a simple linear function of its execution starting time. For the jobs with chain precedence constraints, we prove that the weighted sum of squared completion times minimization problem with strong chains and weak chains can be solved in polyn...

full text

GENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS

 This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...

full text

Three-machine Scheduling Problem with Precedence Constraints

This paper deals with a three-machine flow-shop problem in which some of the job sequences are infeasible. It is assumed that jobs are grouped into several disJoint subsets within which a job order is pre-determined. Once the first job in a group has started on a machine, then the entire group must be completed on the machine without starting a job which does not belong to the group. It is furt...

full text

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

full text

Single-Machine Scheduling with Precedence Constraints

We discuss the problem of sequencing precedence-constrained jobs on a single machine to minimize the average weighted completion time. This problem has attracted much attention in the mathematical programming community since Sidney’s pioneering work in 1975 (Sidney, J. B. 1975. Decomposition algorithms for single machine scheduling with precedence relations and deferral costs. Operations Resear...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 24  issue 2

pages  115- 122

publication date 2011-06-01