Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts
Authors
Abstract:
Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem, it is assumed that each time period includes a number of discontinuous intervals called work shifts. A novel mixed integer linear programming model is formulated. Since this problem is NP-hard in the strong sense, a new heuristic algorithm is developed to construct a complete schedule from a solution matrix that is embedded in the proposed Tabu search. A number of test problems have been solved to compare the performance of the proposed method with the exact method. The results show that the proposed tabu search is an effective and efficient method for simultaneous production planning and scheduling in hybrid flow shop systems.
similar resources
A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
full textModeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
full textA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
full textA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
full textA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
full textsimoltaneous lot-sizing and scheduling in hybrid flow shop production environment with resource constraint
the aim of this paper is to study a multi-product, multi-period production systems in a hybrid flow shop so that lot-sizing and scheduling will be detemined simultaneously. a new mixed-integer programming model is proposed to formulate the studied problem. the objective function in this investigation includes the total cost of production, inventory and external supply. in the case of not satisf...
full textMy Resources
Journal title
volume 12 issue 1
pages 198- 214
publication date 2019-01-24
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023