Simulation of tunnel boring machine utilization: A case study
Authors
Abstract:
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools’ replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
similar resources
the reliability of a tunnel boring machine
greater levels of complexity in tunnelling with tunnel boring machine (tbm) allow higher chances of failures that may increase the potential hazardous risks. this paper presents the results of a study on tbm reliability using risk analysis. machinery failure mode and effect analysis was applied to analyze the risks of a tbm using qs9000 and sae.j1739 recommendations. for this purpose, 48 failur...
full textSimulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine
Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stre...
full textAirflow inside tunnel boring machine: A numerical study and an experimental verification
Knowledge of the airflow distribution inside a Tunnel Boring Machine (TBM) can create a safe working environment for workers and machinery. The airflow quality and the related mass flow rate in the ventilation system should be sufficient to dilute gases and remove dust inside the tunnel. In this work, airflow distribution in the single shield TBM tunnel was studied using computational fluid dyn...
full textTunnel boring machine positioning automation in tunnel construction
Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...
full textRAM analysis of earth pressure balance tunnel boring machines: A case study
Earth pressure balance tunnel boring machines (EPB-TBMs) are favorably applied in urban tunneling projects. Despite their numerous advantages, considerable delays and high maintenance cost are the main disadvantages these machines suffer from. Reliability, availability, and maintainability (RAM) analysis is a practical technique that uses failure and repair dataset obtained over a reasonable ti...
full textMy Resources
Journal title
volume 9 issue 1
pages 53- 60
publication date 2018-01-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023