Abstract:

From the optimization point of view, an optimum solution of the unit commitment problem with reliability constraints can be achieved when all constraints are simultaneously satisfied rather than sequentially or separately satisfying them. Therefore, the reliability constraints need to be appropriately formulated in terms of the conventional unit commitment variables. In this paper, the reliability-constrained unit commitment problem is formulated in a mixed-integer program format. Both the unit commitment risk and the response risk are taken into account as the probabilistic criteria of the operating reserve requirement. In addition to spinning reserve of generating units, interruptible load is also included as a part of operating reserve. The numerical studies using IEEE-RTS indicate the effectiveness of the proposed formulation. The obtained results are presented and the implementation issues are discussed. Two sensitivity analyses are also fulfilled to illustrate the effects of generating unit failure rates and interruption time of interruptible load.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Unit Commitment Considering Position of Interruptible Load in Energy and Reserve Simultaneous Market

In this paper security constrained unit commitment (SCUC) is employed for simultaneous clearing of energy and reserve markets. Spinning reserve of production units and interruptible loads (IL) are used as system operation reserve. Some restrictions on the use of interruptible loads, such as maximum load curtailed, maximum curtailment hour in a day, maximum length of each curtailment are also co...

full text

Solving Constrained Unit Commitment Problem Considering Valve Point Effect

Optimization of the power system plays a major role in power system planning. Unit Commitment and Economic Dispatching are the most important part of every plant-planning project. Unit Commitment is the problem that searches the economical way for power generation, when the power consumption and altered constraints of the power plants are considered. Recently, the attention of the environmental...

full text

Solving Security Constrained Unit Commitment by Particle Swarm Optimization

The issue of unit commitment is one of the most important economic plans in power system. In modern and traditional power systems, in addition to being economical of the planning, the issue of security in unit operation is also of great importance. Hence power system operation confronts units’ participation and input considering network security constrains. The issue of units’ participation is ...

full text

solution of security constrained unit commitment problem by a new multi-objective optimization method

چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...

Security Constrained Unit Commitment Based Load and Price Forecasting Using Evolutionary Optimized LSVR

In this paper, a local predictor approach based on proven powerful regression algorithm which is support vector regression (SVR) combined with space reconstruction of time series is introduced. In addition, real value genetic algorithm (GA) has been utilized in the proposed method for optimization of the parameters of the SVR. In the proposed approach, the embedding dimension and the time delay...

full text

Security-Constrained Unit Commitment Considering Large-Scale Compressed Air Energy Storage (CAES) Integrated With Wind Power Generation

Environmental concerns and depletion of nonrenewable resources has made great interest towards renewable energy resources. Cleanness and high potential are factors that caused fast growth of wind energy. However, the stochastic nature of wind energy makes the presence of energy storage systems (ESS) in wind integrated power systems, inevitable. Due to capability of being used in large-scale sys...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 3  issue 1

pages  10- 20

publication date 2007-01

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023