RAM analysis of earth pressure balance tunnel boring machines: A case study
Authors
Abstract:
Earth pressure balance tunnel boring machines (EPB-TBMs) are favorably applied in urban tunneling projects. Despite their numerous advantages, considerable delays and high maintenance cost are the main disadvantages these machines suffer from. Reliability, availability, and maintainability (RAM) analysis is a practical technique that uses failure and repair dataset obtained over a reasonable time for dealing with proper machine operation, maintenance scheduling, cost control, and improving the availability and performance of such machines. In the present study, a database of failures and repairs of an EBP-TBM was collected in line 1 of Tabriz subway project over a 26-month interval of machine operation. In order to model the reliability of the TBM, this machine was divided into five distinct subsystems including mechanical, electrical, hydraulic, pneumatic, and water systems in a series configuration. According to trend and serial correlation tests, the renewal processes were applied, for analysis of all subsystems. After calculating the reliability and maintainability functions for all subsystems, it was revealed that the mechanical subsystem with the highest failure frequency has the lowest reliability and maintainability. Similarly, estimating the availability of all subsystems indicated that the mechanical subsystem has a relatively low availability level of 52.6%, while other subsystems have acceptable availability level of 97%. Finally, the overall availability of studied machine was calculated as 48.3%.
similar resources
ram analysis of earth pressure balance tunnel boring machines: a case study
earth pressure balance tunnel boring machines (epb-tbms) are favorably applied in urban tunneling projects. despite their numerous advantages, considerable delays and high maintenance cost are the main disadvantages these machines suffer from. reliability, availability, and maintainability (ram) analysis is a practical technique that uses failure and repair dataset obtained over a reasonable ti...
full textA Machine Learning Approach to Predicting and Maximizing Penetration Rates in Earth Pressure Balance Tunnel Boring Machines
Modern tunneling projects will often rely on a Tunnel Boring Machines (TBMs) rather than traditional drill and blast (D&B) methods, because of TBMs’ increased tunneling efficiency[1]. TBMs have a circular drill at the front, which can range in diameter from 1 meter to 19.25 meters, depending on the desired use for the completed tunnel. Applications of tunnels dug by TBMs range from underground ...
full textSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
full textesp needs analysis of iranian ma students: a case study of university of isfahan
نیاز سنجی دانشجویان کارشناسی ارشد ایرانی در رابطه با زبان تخصصی: مطالعه ای در دانشگاه اصفهان هدف از این مطالعه بررسی نیازهای یادگیری زبان خارجی دانشجویان کارشناسی ارشد دانشجویان دانشگاه اصفهان در رشته های زیست شناسی، روانشناسی، تربیت بدنی، حسابداری و فلسفه ی غرب میباشد. در مجموع 80 دانشجودر پنج رشته ی متفاوت از دانشگاه اصفهان در این پژوهش شرکت داشتند.علاوه بر این هشتاد دانشجو،25 استاد دروس ت...
15 صفحه اولFactors influencing performance of hard rock tunnel boring machines
Intact rock properties together with rock mass characteristics should be well investigated for selection of proper tunnel boring machine (TBM) for tunneling in various ground conditions. This is due to the significant impact of rock mass characteristics on machine performance. TBMs are site specific and designed for optimal performance in given ground conditions. When selected and put to work a...
full textMy Resources
Journal title
volume 49 issue 2
pages 173- 185
publication date 2015-12-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023