Multi-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization
Authors
Abstract:
Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system is one of the most important steps that have to be considered in the design of assembly lines. The purpose of the assembly line balancing is to assign tasks to the workstation called the station, so that prerequisite relationships, cycle times, and other assembly line constraints to be met and a number of line performance criteria to be optimized. In this study, considering the social responsibility related objective function, a mathematical model is proposed for scheduling and balancing the cost-oriented assembly line that has resource constraints with cost uncertainty. The box set robust optimization is applied and the obtained model is solved with the augmented epsilon constraint in the GAMS and some test problems and their results are presented. Finally, the cost parameter has been changed in a robust optimization approach and the obtained results have been analyzed for different costs.
similar resources
cost-oriented assembly line balancing with resource constraint
in this paper, based on the background of cost-oriented assembly line balancing problems, a novel mathematical model for scheduling and balancing the assembly line is offered that with the combination of task sequence-dependent setup time, parallel stations and resource constraint, minimizes the operational and investment costs of assembly system. due to the complexity of the problem, the equat...
full textA Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers
This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...
full textSolving a multi-objective mixed-model assembly line balancing and sequencing problem
This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...
full textA Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
full textA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
full textA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
full textMy Resources
Journal title
volume 7 issue 1
pages 220- 232
publication date 2020-07-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023