Abstract:
This study proposes a new multi-item inventory model with hybrid cost parameters under a fuzzy-stochastic constraint and permissible delay in payment. The price and marketing expenditure dependent stochastic demand and the demand dependent the unit production cost are considered. Shortages are allowed and partially backordered. The main objective of this paper is to determine selling price, marketing expenditure, credit period, and variables of inventory control simultaneously for maximizing the total profit. To solve the problem, first some transformations are applied to convert the original problem into a multi-objective nonlinear programming problem, of which each objective has signomial terms. Then, the multi-objective nonlinear programming problem is solved by first converting it into a single objective problem and then by using global optimization of signomial geometric programming problems. At the end, several numerical examples and sensitivity analysis are done to test model and solution procedure and also obtain managerial insights.
similar resources
A Multi-supplier Inventory Model with Permissible Delay in Payment and Discount
This paper proposes a multi-supplier multi-product inventory model in which the suppliers have unlimited production capacity, allow delayed payment, and offer either an all-unit or incremental discount. The retailer can delay payment until after they have sold all the units of the purchased product. The retailer’s warehouse is limited, but the surplus can be stored in a rented warehouse at a...
full textA Two-warehouse Inventory Model for Deteriorating Items with Permissible Delay under Exponentially Increasing Demand
In this study, a two-warehouse inventory model with exponentially increasing trend in demand involving different deterioration rates under permissible delay in payment has been studied. Here the scheduling period is assumed to be a variable. The objective of this study is to obtain the condition when to rent a warehouse and the retailer's optimal replenishment policy that minimizes the total re...
full textMulti-item Fuzzy Inventory Problem with Space Constraint via Geometric Programming Method
In this paper, a multi-item inventory model with space constraint is developed in both crisp and fuzzy environment. A profit maximization inventory model is proposed here to determine the optimal values of demands and order levels of a product. Selling price and unit price are assumed to be demand-dependent and holding and set-up costs sock dependent. Total profit and warehouse space are consid...
full texta multi-supplier inventory model with permissible delay in payment and discount
this paper proposes a multi-supplier multi-product inventory model in which the suppliers have unlimited production capacity, allow delayed payment, and offer either an all-unit or incremental discount. the retailer can delay payment until after they have sold all the units of the purchased product. the retailer’s warehouse is limited, but the surplus can be stored in a rented warehouse at a...
full textInventory model with composed shortage and permissible delay in payment linked to order quantity
In today’s business transactions, it is frequently observed that a customer is allowed some grace period (permissible delay in payment) before settling the account with the supplier or producer. This policy is advantageous both for the supplier and customer since supplier attracts more customers and customer does not have to pay any interest during this fixed period either. In this paper, the r...
full textAn EOQ Model for a Deteriorating Item with Time Dependent Quadratic Demand and Variable Deterioration under Permissible Delay in Payment
In a recent paper, Khanra, Ghosh and Chaudhuri’s (2011) presented an EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment. Deterioration considered in most of the EOQ models is constant, while in most of the practical cases the deterioration rate increases with time. This work is motivated by Khanra, Ghosh and Chaudhuri’s (2011) paper extend...
full textMy Resources
Journal title
volume 11 issue 2
pages 0- 0
publication date 2018-04-01
By following a journal you will be notified via email when a new issue of this journal is published.