Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

Authors

  • Sama Ahmadpour School of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
  • Vahidreza Ghezavati School of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
Abstract:

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. Then, considering uncertainty condition for parameters, it provided a fuzzy scheduling model and validated models by solving different examples. The proposed mathematical programming model optimizes the allocation of limited resources to project activities for scheduling purposes in an essential activity in the real condition of scheduling problems. Moreover, the proposed model can decrease the risk of deviation from scheduling by allocating members with higher skill factors to critical activities. Then, considering uncertainty condition for parameters, it provided a fuzzy scheduling model and validated models by solving different examples. Considering fuzzy conditions for the calendar of the project and multi-skill operators are firstly considered in this paper. Also, the recyclable resources are staff resources which are being considered for the model concurrently in response to the risks of availability to resources and delay in completing the project under uncertainty. The results derived from the model solved by CPLEX indicated a decreased need for employment and shortened project completion duration. Assuming the uncertainty of available resource capacity at any time, the results obtained from the fuzzy model for the value of objective function were evaluated under the influence of the resource calendar and showed the benefits. Effect of the multi-skill members with calendar constraints on the model is tested, and the advantages are determined.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

full text

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

full text

Modeling and Solving Project Scheduling with Calendars

Resource-constrained project scheduling with the objective of minimizing project duration (RCPSP) is one of the most studied scheduling problems. In this paper we consider the RCPSP with general temporal constraints and calendar constraints. Calendar constraints make some resources unavailable on certain days in the scheduling period and force activity execution to be delayed while resources ar...

full text

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

full text

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

full text

Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization

This paper presents a Particle SwarmOptimization (PSO) algorithm for solving Resource-Constrained Project Scheduling Problems (RCPSP). The PSO model is a new population based optimization strategy introduced by Kennedy and Eberhart in 1995. The PSO is a cooperative and competitive algorithm who belongs to the class of the evolutionary algorithms. We here specialize the algorithm of PSO to the p...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 15  issue 1

pages  -

publication date 2019-12-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023