Minimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA

Authors

  • Ali Rahbari Department of Industrial Engineering, Alborz Campus, University of Tehran, Tehran, Iran
  • Mojtaba Abdollahi School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • Navid Salmanzadeh Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
  • Sadegh Salesi School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
Abstract:

This paper presents a bi-objective MIP model for the flexible flow shop scheduling  problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release times. Two Taguchi-based-tuned algorithms: (i) non-dominated sorting genetic algorithm II (NSGA-II), and (ii) non-dominated ranked genetic algorithm (NRGA) are applied to solve themodel. Six numerical examples with different sizes (small, medium, and large) are used to demonstrate the applicability and to exhibit the efficacy of the algorithms. The results show that the NRGA outperforms significantly the NSGA-II in the performance metrics for all six numerical examples.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Minimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines

Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...

full text

the search for the self in becketts theatre: waiting for godot and endgame

this thesis is based upon the works of samuel beckett. one of the greatest writers of contemporary literature. here, i have tried to focus on one of the main themes in becketts works: the search for the real "me" or the real self, which is not only a problem to be solved for beckett man but also for each of us. i have tried to show becketts techniques in approaching this unattainable goal, base...

15 صفحه اول

on the relationship between using discourse markers and the quality of expository and argumentative academic writing of iranian english majors

the aim of the present study was to investigate the frequency and the type of discourse markers used in the argumentative and expository writings of iranian efl learners and the differences between these text features in the two essay genres. the study also aimed at examining the influence of the use of discourse markers on the participants’ writing quality. to this end the discourse markers us...

15 صفحه اول

the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test

the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...

15 صفحه اول

supply and demand security of energy in central asia and the caucasus

امنیت انرژی به معنی عرضه مداوم و پایدار همراه با قیمت های معقول در حامل های انرژی، که تهدیدات امنیتی، سیاسی، اقتصادی، محیط زیستی و روانی را کاهش دهد. امروزه نفت و گاز تنها، کالای تجاری نیست بلکه بعنوان ابزار سیاسی مورد استفاده قرار می گیرد.اختلاف میان روسیه و اکراین بر سر انرژی در ژانویه 2006، تهدیدی برای امنیت انرژی اروپا ایجاد کرد. در این تحقیق ما تلاش کردیم که نقش انرژی آسیای میانه و قفقاز ر...

15 صفحه اول

Minimizing weighted total earliness, total tardiness and setup costs

A single machine scheduling problem is described which covers earliness costs, tardiness costs and setup costs. Setups are needed whenever a switch is made to a job of another product family. All jobs within the same product family have the same processing time. Besides setup costs also setup times are involved. Idle time is allowed, preemption is not allowed. Both a mixed integer programming f...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 11  issue Special issue: 14th International Industrial Engineering Conference

pages  150- 162

publication date 2018-09-26

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023