Medium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model
Authors
Abstract:
Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic processes in discrete time. We apply this methodology to hydrosystem operation assuming random electricity prices and random inflows to the reservoir system. After describing the multistage stochastic model a simple case study is presented. In particular we use the model for pricing an electricity delivery contract in the framework of indifference pricing.
similar resources
medium term hydroelectric production planning - a multistage stochastic optimization model
multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. one of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...
full textAn enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling
Handling uncertainty in natural inflow is an important part of a hydroelectric scheduling model. In a stochastic programming formulation, natural inflow may be modeled as a random vector with known distribution, but the size of the resulting mathematical program can be formidable. Decomposition-based algorithms take advantage of special structure and provide an attractive approach to such probl...
full textA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
full textA Stochastic Operational Planning Model for Smart Power Systems
Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independe...
full textMy Resources
Journal title
volume 47 issue 1
pages 139- 152
publication date 2014-06-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023