Integrated Preventive and Predictive Maintenance Markov Model for Circuit Breakers Equipped With Condition Monitoring

Authors

  • A. A. Shojaei Department of Electrical Engineering, Neyshabur Branch, Islamic Azad University, Neyshabur, Iran.
  • A. Karimabadi Department of Electrical Engineering, Neyshabur Branch, Islamic Azad University, Neyshabur, Iran.
  • E. Kamyab Khorasan Regional Electricity Company (KREC), Mashhad, Iran.
  • M. E. Hajiabadi Electrical and Computer Engineering Department, Hakim Sabzevari ‎University, Sabzevar, Iran.
Abstract:

The Circuit Breaker (CB) is one of the most important equipment in power systems. CB must operate reliably to protect power systems as well as to perform tasks such as load disconnection, normal interruption, and fault current interruption. Therefore, the reliable operation of CB can affect the security and stability of power network. In this paper, effects of Condition Monitoring (CM) of CB on the maintenance process and related costs are analyzed. For this, A mathematical formulation to categorize and model equipment failures based on their severity is developed. By CM, some of the high severity failures, named major failures, can be early detected and be corrected as a minor failure. This formulation quantifies the effect of CM on the outage rate and Predictive Maintenance (PDM) rate of equipment. Also, by combining the predictive maintenance to preventive maintenance, the Integrated Preventive and Predictive Maintenance Markov model is presented to analyze the effect of CM on the maintenance process. Finally, the optimal inspection rates of CBs based on the minimum maintenance cost in the traditional and the proposed Markov model are determined. To verify the effectiveness and applicability of the method, the proposed approach is applied to the CBs of KREC in Iran.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Predictive Maintenance of Circuit Breakers

................................................................................................................................................ iii Acknowledgements.................................................................................................................................v Table of

full text

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

full text

Integrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty

In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied.  The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...

full text

An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system

Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...

full text

Availability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval

Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availabili...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 16  issue 2

pages  215- 227

publication date 2020-06

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023