How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot
author
Abstract:
The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requirements Planning (CMRP) approach. We discuss the disadvantages of Discrete MRP (DMRP) approach and analyze the conditions, applications and the manner of applying CMRP approach in our problems.
similar resources
Continuous materials requirements planning (CMRP) approach when order type is lot for lot and safety stock is zero and its applications
The materials requirements planning (MRP) approach, applied in production planning and management has some weaknesses. One of those is the discreteness of time so called time periods in this approach which makes it impossible to order the requirements at irregular time moments or periods. In this paper, a new form of MRP, named as continuous materials requirements planning (CMRP) approach, is i...
full textLot-sizing and flow production in an MRP-environment
In the paper methods are developed to analyze a production process for professional equipment with advanced electronic and mechanical features. The starting point of the analysis is to find ways for production control and production organization which maintain and even strenghten the advantages of the MRP-system. but also mend the disadvantages to a large extent. The main advantages which could...
full textAugmenting the lot sizing order quantity when demand is probabilistic
In this paper we consider a single item, discrete time, lot sizing situation where demand is random and its parameters (e.g., mean and standard deviation) can change with time. For the appealing criterion of minimizing expected total relevant costs per unit time until the moment of the next replenishment we develop two heuristic ways of selecting an appropriate augmentation quantity beyond the ...
full textAn Integrated Production-Inventory Model with Backorder and Lot for Lot Policy
inventory model, backorder buyer , vendor, lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...
full textAdaptive Production Management for Small-Lot Enterprise
Currently the methodology of eliminating the negative effects of the issues in ramp-up stage mostly involves the increase in investment and updating the design data. In the paper the authors consider an approach that can be applied on every level of ramp-up production: from suppliers to shopfloor operators. The architecture of the system is described and the first implementation results are given.
full textMy Resources
Journal title
volume 21 issue 1
pages 17- 22
publication date 2010-06
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023