Evolution of AG mill shell liner design at Gol-E-Gohar concentration plant

Authors

  • A. R. Hasankhoei Kashigar Mineral Processing Research Center, Shahid Bahonar University of Kerman, Kerman, Iran
  • E. Arghavani Kashigar Mineral Processing Research Center, Shahid Bahonar University of Kerman, Kerman, Iran
  • M. Yahyaei Kashigar Mineral Processing Research Center, Shahid Bahonar University of Kerman, Kerman, Iran
  • S. Banisi Mining Engineering Department, Shahid Bahonar University of Kerman, Kerman, Iran
Abstract:

Liner design is becoming an increasingly more important tool for the AG/SAG mill performance optimization. The Gol-E-Gohar iron ore concentration plant uses three 9 m × 2.05 m autogenous mills (AG) in parallel in a dry operation. Due to large variations in feed characteristics and inadequate blending, the performance of AG mills has been lower than the target value. In order to increase the circuit throughput while maintaining the desired product size, based upon physical and numerical simulations, it was proposed to convert the AG mills to SAG mills. Simulation of the charge trajectory indicated that increasing the liner lifter face angle from 7 to 30° could provide an appropriate charge trajectory in the SAG mode. Installation of the new liners and conversion of AG mill No. 2 to SAG mill, by adding 5% (v/v) balls, resulted in an overall increase of 31% in throughput (from 419 to 548 t/h). Measurement of the wear profiles of shell liners indicated that the wear along the liner length was not uniform. In order to arrive at a uniform wear profile, a new liner design was proposed. Installing the second liner design in AG mill No. 1 and converting it to SAG mill increased the mill throughput by 18% (from 413 to 489 t/h), while the liner life showed a 7% increase. Measurement of the wear profiles of the second liner set indicate that the maximum wear occurs in the centre of the mill. A new liner design was then designed by increasing the width of the lifter top from 12.5 to 15 cm and increasing the lifter height from 16 to 26 cm to enhance the liner life.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Increasing drying efficiency by modifying the design of feed chute of the Gol-e-Gohar pelletizing plant ball mill

Pelletizing plant of the Gol-E-Gohar mining and industrial company consists of a burner, a dry ball mill (6.2 m × 13 m), and an air separator. The ball mill consists of a 2 m-long drying and an 11 m-long grinding chambers. The iron ore concentrate is fed to the drying chamber by a feed chute. It was found that when the feed moisture content increased from 1.3% to 3.5%, the throughput decreased ...

full text

Simulation and Genetic Algorithms for Optimizing Comminution Circuit at Gol-e-Gohar Iron Plant (RESEARCH NOTE)

simulation optimization is a scientific tool that is widely used to design and optimize comminution circuits in mineral processing plants. In this research, first of all, in order to  determine the suitable d80 for cicuit hydrocyclone underflow, the requiremed parameters of simulator (residence time distribution, breakage function, selection function and Plitt’s model calibration) were determin...

full text

environmental effects of gol-e-gohar iron ore mine on groundwater of the area

gol-e-gohar iron ore mine of sirjan in southern part of iran is a large open pit that operates below the groundwater table and during mining operation, dewatering is required to prevent operation processes from flooding. current operation is going on by digging wells in or out of the pit and pumping to prevent flooding. as a result of the former dewatering operation a vast deep cone of depressi...

Feasibility study of Gol-Gohar iron ore open cast mine operation of Iran

Feasibility study of the mining operation is one of the most important parts of the total mineral exploitation process. The economic importance of this, increases with the size of the mineral reserves. Gol-Gohar is one of the largest iron ore mines in Iran with an annual output of some 11 million tons. In this paper, the total costs associated with Gol-Gohar open cast mine have been calculated....

full text

Changing sag mill liners type from Hi-Low to Hi-Hi at Sarcheshmeh copper complex based on physical and numerical modeling

Liner design has become an increasingly more important tool for the AG/SAG mill performance optimization. The Sarcheshmeh copper complex concentration plant uses a SAG mill lined with 48 rows of Hi-Low type liners. Because of breakage of Low type liners and cold welding, the liner replacement task of Low with new Hi type liners has become very difficult and time-consuming. With the objective of...

full text

Conceptual Design of a Commercial Spent Pot Liner Treatment Plant

All aluminium smelter plants discharges high volume extremely toxic electrolytic cell waste known as spent pot liner. Over the years scientists have improvised various methods for disposing these toxic wastes either by diluting with inert material or recovering its carbon value after decontaminating the toxic waste. Present paper outlines conceptual design of a commercial treatment plant which ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 8  issue 4

pages  683- 691

publication date 2017-10-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023