Environmental risk assessment of a dam during construction phase
Authors
Abstract:
The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. "Habitat fragmentation" with a weight of 0.3002, "water pollution" with a weight of 0.295, and "impacts on aquatics" with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to "restoration of the land cover", “conservation of areas surrounding the dam as a new wildlife habitat", “prevention of water contamination”, and "conservation of fish spawning sites".
similar resources
Environmental impacts assessment of construction and utilization phases of tourism projects in Karun Dam IV, Iran
There is a strong mutuality between tourism and environment via the creation of feedback mechanisms, since tourism often places adverse effects upon the quality and quantity of natural and cultural resources of the destination, leading to its qualitative and quantitative degradation. Within theEnvironmental Impacts Assessment (EIA) studies, various methods have been proposed to assess and analy...
full textMonitoring of Cheragh-veis Dam During Construction Using Instrumentation Data and Investigation of dam behavior during impounding
One of the most important challenges in development projects beside designing and performing them is to control immunity and stability of the several parts during different stages of construction, impoundment, and operation. The main purpose of instrumentation in dams is to evaluate operation and reaction of these structures under different load conditions, developing a better understanding...
full textDam Safety During Design, Construction and Operation
Introduction In the foreword to the Malaysian Guidelines for Operation, Maintenance and Surveillance of Dams (Malaysian Inter-Departmental Committee on Dam Safety 1989), it is stated “The expanding inventory of dams has brought into focus the subject of dam safety”. At the time of the guideline publication, there had been a considerable increase in the inventory of dams with those constructed d...
full textenvironmental impacts assessment of construction and utilization phases of tourism projects in karun dam iv, iran
there is a strong mutuality between tourism and environment via the creation of feedback mechanisms, since tourism often places adverse effects upon the quality and quantity of natural and cultural resources of the destination, leading to its qualitative and quantitative degradation. within theenvironmental impacts assessment (eia) studies, various methods have been proposed to assess and analy...
full textenvironmental risk assessment of gotvand-olia dam at operational phase using the integrated method of environmental failure mode and effects analysis (efmea) and preliminary hazard analysis
introduction gotvand-olia as one of the largest constructional projects in iran has been constructed on the karoun river, between masjed soleiman and gotvand regulatory dam in khuzestan province. it is situated in 382.8 km away from the river estuary at a distance of 25 km north of shoushtar city. this study was conducted to identify and assess the risk of gotvand-olia dam on the environment at...
full textdiscursive motivation/demotivation construction: a case of iranian efl majors
بررسی نقش گفتمان در شکل گیری یا کاهش انگیزش فراگیران زبان خارجی موضوع تحقیق نسبتاً جدیدی است. از این رو، تحقیقات کمی در این زمینه وجود دارد. به منظور پر کردن این خلاء ، مطالعه کنونی به بررسی فرآیند گفتمان مدار شکل گیری یا کاهش انگیزش دانشجویان ایرانی زبان انگلیسی پرداخت. نخست، این مطالعه به صورت آزمایشی با 7 نفر (? دانشجوی پسر و 5 دختر) از دانشجویان سال دوم دوره ی کارشناسی زبان و ادبیات انگلیسی ...
My Resources
Journal title
volume 2 issue 4
pages 345- 356
publication date 2016-12-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023