Development of a goal programming model for optimization of truck allocation in open pit mines

Authors

  • A. Mahmoodi Markid Department of Electrical Engineering, Sahand University of Technology, Tabriz, Iran
  • M. Mohtasham Department of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Abstract:

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truck allocation plan in open pit mines and reduce the waiting times of trucks and shovels. The developed goal programming (GP) model is established considering four desired goals: “maximizing shovel production”, “minimizing deviations in head grade”, “minimizing deviations in tonnage feed to the processing plants from the desired feed” and “minimizing truck operating costs”. To employ the developed model, a software is prepared in Visual Studio with C# programming language. In this computer program, the CPLEX optimizer software is incorporated for solving the developed goal programing model. The case study of Sungun copper mine is also considered to evaluate the presented GP model and prepared software. The results obtained indicate that the developed model increases the mine production above 20.6% with respect to the traditional truck allocation plan, while meeting the desired grade and the stripping ratio constraints.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

full text

A quantitative model for evaluation and classification of blastings in open-pit mines

By evaluation of the blasting results, a proper blast pattern can be presented. It is, therefore, essential to employ a reliable method to evaluate blastings for the effective control and optimization of the main cycle operations. This paper aims to propose a criterion for evaluating the blasting results such as the fragmentation, muckpile condition, back-break, and fly rock, and to make a poss...

full text

ore extraction and blending optimization model in poly- metallic open pit mines by chance constrained one-sided goal programming

determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. one of the important operational con...

full text

Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines

Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...

full text

investigating the feasibility of a proposed model for geometric design of deployable arch structures

deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 8  issue 3

pages  359- 371

publication date 2017-07-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023