Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and imposed a high degree of uncertainty to the mine planning procedure while none of the existent algorithms of the pit limit determination consider the metal price uncertainty. Real Option Approach (ROA) is an efficient method of decision making in the condition of uncertainty. This approach usually used for evaluation of defined natural resources projects up to now. This study considering the metal price uncertainty used real option approach to prepare a methodology for determining the Ultimate Pit Limits (UPL). The study was carried out on a non-ferrous metallic cylindrical ore deposit but the achieved methodology can be adjusted for all kinds of the deposits. The achieved methodology was comprehensively described through the examples in a way that can be used by the mine planners.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

full text

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

full text

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

full text

determination of the largest pit with the non-negative net profit in the open pit mines

the determination of the ultimate pit limit (upl) is the first step in the open pit mine planning process. in this stage that parts of the mineral deposit that are economic to mine are determined. there are several mathematical, heuristic and meta-heuristic algorithms to determine upl. the optimization criterion in these algorithms is maximization of the total profit whilst satisfying the...

full text

Development of a goal programming model for optimization of truck allocation in open pit mines

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

full text

A quantitative model for evaluation and classification of blastings in open-pit mines

By evaluation of the blasting results, a proper blast pattern can be presented. It is, therefore, essential to employ a reliable method to evaluate blastings for the effective control and optimization of the main cycle operations. This paper aims to propose a criterion for evaluating the blasting results such as the fragmentation, muckpile condition, back-break, and fly rock, and to make a poss...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 19  issue 5

pages  23- 38

publication date 2008-07

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023