Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
Authors
Abstract:
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizing total tardiness, delivery, holding and machine deteriorating costs. The problem of total tardiness on identical parallel machines is NP-hard, thus the under investigation problem, which is more complicated, is NP-hard too. In this study, a mixed-integer programming (MILP) model is presented and an efficient hybrid genetic algorithm (HGA) is proposed to solve the concerned problem. A new crossover and mutation operator and a heuristic algorithm have also been proposed depending on the type of problem. In order to evaluate the performance of the proposed model and solution procedure, a set of small to large test problems are generated and results are discussed. The related results show the effectiveness of the proposed model and GA for test problems.
similar resources
A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
full textSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
full textDue-date assignment and parallel-machine scheduling with deteriorating jobs
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...
full textOnline Makespan Scheduling of Linear Deteriorating Jobs on Parallel Machines
Traditional scheduling assumes that the processing time of a job is fixed. Yet there are numerous situations that the processing time increases (deteriorates) as the start time increases. Examples include scheduling cleaning or maintenance, fire fighting, steel production and financial management. Scheduling of deteriorating jobs was first introduced on a single machine by Browne and Yechiali, ...
full textA general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs
In this article, we study a single-machine scheduling problem of minimizing the total tardiness for a set of independent jobs. The processing time of a job is modeled as a step function of its starting time and a specific deteriorating date. A mixed integer programming model was applied to the problem and validated. Since the problem is known to be NP-hard, we proposed a heuristic named simple ...
full textScheduling Linearly Deteriorating Jobs on Multiple Machines
This paper investigates the scheduling problems in which the job processing times do not remain constant but are increasing linear functions of their starting times. Two deteriorating scheduling models, Model 1 and Model 2, for multiple machines are considered, with the goal being to minimize the makespan. In this paper, we propose an efficient heuristic for Model 1 and prove that the ratio of ...
full textMy Resources
Journal title
volume 11 issue 1
pages 35- 50
publication date 2018-03-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023