Abstract:

This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the advantages of assigning several workers instead of single workers to each workstation in such a class of problem, a mixed integer programming formulation is presented. This model minimizes the number of temporary workers on the line as the first objective and the number of workstations as the secondary one while cycle time and the number of permanent workers are fixed. The proposed formulation is applied to solve some experimental instances found in the literature. The comparison between the optimal solutions of the proposed model and those of traditional assembly lines with a single-manned workstation indicates that our model has been able to reduce the line length on average of 24.40 per cent while the number of unskilled workers remains optimal. 

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Balancing assembly line with skilled and unskilled workers

In this paper, we present the process of rebalancing the line at motorcycle-assembly plant. The company found it necessary to rebalance its line, since it needs to increase production in the spring and summer months. The main characteristics of the problem are as follows: (i) the company hires temporary staff, who need more time to carry out their tasks than permanent workers; (ii) there must a...

full text

Integrated Assembly Line Balancing with Skilled and Unskilled Workers

In this paper, we consider the problem of designing an integrated assembly line when many skilled and unskilled workers are available. This problem arises when there are certain limited resources available such as skilled workers in which the operation time for every task is different depending on assignment of the unskilled workers to help the skilled workers. The selection of both skilled wor...

full text

A Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers

This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...

full text

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

full text

a cost-oriented model for multi-manned assembly line balancing problem

in many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. this type of assembly line is called multi-manned assembly line (mal). in the classical multi-manned assembly line balancing problem (malbp) the objective is to minimize the manpower needed to manufacture one product unit. apart from the manpower, othe...

full text

Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing

This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 13  issue Special issue: 16th International Industrial Engineering Conference

pages  66- 77

publication date 2020-02-01