An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
Authors
Abstract:
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other existing algorithms. The effectiveness of IGA is demonstrated through comparison.
similar resources
an iterated greedy algorithm for flexible flow lines with sequence dependent setup times to minimize total weighted completion time
this paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other exist...
full textAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
full textNew scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
full textAn Iterated Greedy Algorithm for the Flowshop Problem with Sequence Dependent Setup Times
The flowshop problem (FSP) is one of the most thoroughly studied scheduling problems. In the FSP, a set N = {1, . . . , n} of n independent jobs has to be processed on a set M = {1, . . . ,m} of m machines. Every job j, j ∈ N , requires a given fixed, non-negative processing time pij on every machine i, i ∈ M . In a flowshop, all n jobs are to be processed on the m machines in the same order, t...
full textAn Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking
Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...
full textMy Resources
Journal title
volume Volume 2 issue Issue 3
pages 33- 37
publication date 2010-02-07
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com