AN EXTENSION TO STOCHASTIC TIME-COST TRADE-OFF PROBLEM OPTIMIZATION WITH DISCOUNTED CASH FLOW
Authors
Abstract:
In this paper, an efficient multi-objective model is proposed to solve time-cost trade off problem considering cash flows. The proposed multi-objective meta-heuristic is based on Ant colony optimization and is called Non Dominated Archiving Ant Colony Optimization (NAACO). The significant feature of this work is consideration of uncertainties in time, cost and more importantly interest rate. A fuzzy approach is adopted to account for uncertainties. Mathematics of cash-flow analysis in a fuzzy environment is described. A case study is done using the proposed approach
similar resources
Resource Investment Problem with Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...
full textResource Investment Problem With Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...
full textA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
full textA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
full textA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
full textAn Extension to the Economic Production Quantity Problem with Deteriorating Products Considering Random Machine Breakdown and Stochastic Repair Time
The recent advances in manufacturing systems motivate several studies to focus on Economic Production Quantity (EPQ) problem. Althuogh there are several extentions to the EPQ, this paper provides a new extension by considering some of the real world parameters like: (a) shortages in the form of partial backordering, (b) inventory can deteriorate stochastically, (c) machine can break down stocha...
full textMy Resources
Journal title
volume 1 issue 4
pages 557- 570
publication date 2011-12
By following a journal you will be notified via email when a new issue of this journal is published.