An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

Authors

  • Amir Najafi Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
  • Fatemeh Azimi Department of Mathematics, Qazvin Branch, Islamic Azad University, Qazvin, Iran
Abstract:

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past can be good predictors of the future. It was originally developed to follow time and cost of a project, but it has some weak points in analyzing the time performance of a project. In this article, we first explain these weak points in detail. Then, to improve them, we develop two methods: the first one is a simple and approximation method to minimize errors in EVM analysis with a high probability and the second method is an exact approach that uses earned value and floating time concepts. At the end, the performance of the proposed methods is evaluated and analyzed on a set of instances containing a variety of project sizes. The results of this experimentation show that the efficiency of the methods is relatively good.

Download for Free

Sign up for free to access the full text

Already have an account?login

similar resources

an extension of the earned value management to improve the accuracy of schedule analysis results

a project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [ce1] major factors for a project to be successful are applying performance measurement and feedback tool. one such well-known performance measurement tool to control the project execution is earned value management (evm). evm uses the fundamental principle that trends in the past ca...

full text

Optimization of the Inflationary Inventory Control The An extension of the earned value management to improve the accuracy of schedule analysis results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past can be g...

full text

the analysis of the role of the speech acts theory in translating and dubbing hollywood films

از محوری ترین اثراتی که یک فیلم سینمایی ایجاد می کند دیالوگ هایی است که هنرپیش گان فیلم میگویند. به زعم یک فیلم ساز, یک شیوه متأثر نمودن مخاطب از اثر منظوره نیروی گفتارهای گوینده, مثل نیروی عاطفی, ترس آور, غم انگیز, هیجان انگیز و غیره, است. این مطالعه به بررسی این مسأله مبادرت کرده است که آیا نیروی فراگفتاری هنرپیش گان به مثابه ی اعمال گفتاری در پنج فیلم هالیوودی در نسخه های دوبله شده باز تولید...

15 صفحه اول

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

surveying the relevance of proportions to the content of quran verses

چکیده : قرآن چشمه سار زلال هدایتی است که از سوی خداوند حکیم نازل شده تا بشر را به سر منزل کمال برساند. و در این راستا از شیوه های گوناگون بیانی خطابی و بلاغی استفاده کرده تا با فطرت زیبا طلب انسان درآمیزد و اورا مقهور خویش ساخته، به سوی کمالات سوق دهد.ازجمله جنبه های بارز اعجاز بیانی قرآن وجود فواصل در پایان آیات است که کار برد سجع و قافیه در کلام بشر شبیه آن است. برخی ازعلمای سلف تفاوت هایی ب...

15 صفحه اول

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 9  issue 1

pages  63- 75

publication date 2016-01-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023